Loading...
HomeMy WebLinkAboutB14-2540 (2)DEVELOPMENT SERVICES BUTTE COUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES 5 INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) :530.538.4365 (Cut off time for inspections is 2pm) Development Services cannot guarantee inspections on the date reauested Office: 530.538.7601 Fax: 530. Permit No: B14-2540 Issued: 1/15/2015 Address: ROSE AVE, CHIC9, , (^tl e.c'trc'c.}ot kir IvLn- con APN: 043-681-044 Owner: CALIFORNIA WATER SER, Permit Type: GENERATOR COM Description: COMM DIESEL GENERATOR W CONIC PA 538.7785 www.ButteCounty.net/dds Flood Zone: None SRA Area: No SETBACKS for Zoning. AG. SRA. PW Front: Centerline of Road: Rear: SRA: Side: AG: Other: Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Inspection Type IVR INSP DATE Setbacks 131 Foundations / Footings 111 _2 - Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 131 Pool Plumbing Test Do N t Pour Concrete Until Above are Signed Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 612 Tiedown/Soft Set System 611 Permanent Foundation System Do Not Install Floor Sheathing or Slab Until Above Signed ShearwallB.W.P.-Interior 134 Shearwall/B.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Serial Numbers: Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Swimming Pools Setbacks Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 Swimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Manufactured Homes Setbacks 131 Blocking/Underpining 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirting/Steps/Landings 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire Department/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final "PROJECT FINAL -rrolecr rmai is a t ernucaic of vccupancy for txesiaennai vniyl PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION Inspector Copy BUTTE COUNTY DEPARTMENT OF DEVELOPMENT SERVICES BUILDING PERMIT 24 HOUR INSPECTION (IVR)#: (530) 538-4365 OFFICE #: (530) 538-7601 FAX#: (530) 538-2140 or (530)538-7785 WEB SITE: www.buttecounty.net/dds PROJECT INFORMATION Site Address: ROSE AVE Owner: Permit No: B14-2540 APN: 043-681-044 CALIFORNIA WATER SER, Issued Date: 1/15/2015 By: WET Permit type: MECH ELECTRIC PLUMB 1720 NORTH FIRST STREET Subtype: GENERATOR COM SAN JOSE, CA 95112 Expiration Date: 1/15/2016 Description: COMM DIESEL GENERATOR W C (408) 367-8200 Occupancy: Zoning: SRI Contractor Applicant: Square Footage: CHICO ELECTRIC CHEY BOESEN Building Garage Remdl/Addn 36 WEST EATON ROAD 36 WEST EATON ROAD CHICO, CA 95973 CHICO, CA 95973 Other Porch/Patio Total (530)891-1933 (530)891-1933 FEE INFORMATION DB CA SB1473 100% $1.00 DBMSC SUPPLEMENTAL INSPECTION, $127.00 DBA PERMIT ISSUANCE NON -RES 09 $63.00 DP PLANNING CLEARANCE FOR PERK $81.50 DBA TRAVEL DOCUMENTATION NON $95.00 DBE GENERATOR INSTLTN-PER KW T $152.40 DBE GENERATOR INSTLTN-PER KW T $228.60 DBE OTHER ELECTRICAL INSPECTIO] $127.00 DBFIRE FIRE COMM PLAN CHECK FE] $228.00 Total Charged: $1,230.50 Fees Paid: $1,230.50 DBMSC SPLMNTL PC/HR 4+ PREPOST $127.00 Balance Due: $0.00 Job Value: $7,500.00 LICENSED CONTRACTOR'S DECLARATION OWNER / BUILDER DECLARATION Contractor (Name) State Contractors License No. / Class / Expires I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for CHICO ELECTRIC 454345 / B C10 / 4/30/2016 the reason(s) indicated below by the checkmark(s) I have placed next to the applicable item(s) (Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions I HEREBY AFFIRM UNDER PENALTY OF PERJURY that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt from licensure and the basis for the X 1/15/2015 alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).): ❑1, as owner of the property, or my employees with wages as their sole compensation, will do U all of or L) portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, Contractor's Signature Date WORKERS' COMPENSATION DECLARATION I HEREBY AFFIRM UNDER PENALTY OF PERJURY one of the following declarations: however, the building or improvement is sold within one year of completion, the Owner -Builder ❑I have and will maintain a certificate of consent to self4nsure for workers' will have the burden of proving that it was not built or compensation, issued by the Director of Industrial Relations as provided for by Section improved for the purpose of sale.). 3700 of the Labor Code, for the performance of the work for which this permit is issued. Policy No.11I, as owner of the property, am exclusively contracting with licensed Contractors to ❑construct I have and will maintain workers' compensation insurance, as required by Section 3700 the project (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who of the Labor Code, for the performance of the work for which this permit is issued. My workers' contracts for the projects with a licensed Contractor pursuant to the Contractors' State License compensation insurance carrier and policy number are: Law.). Carrier: SELF INSURANCE policy Number: 2246 Exp. Date: 1/1/2016 I am exempt from licensure under the Contractors' State License Law for the following ❑reason: I certify that, in the performance of the work for which this permit is issued, I shall not 1/15/2015 X employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with Owner's Signature Date those provisions. PERMIT APPLICANT DECLARATION X 1/15/2015 Signature Date By my signature below, I certify to each of the following: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS I am U a California licensed contractor or U the property owner* or U authorized to UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES act on the property owner's behalf**. I have read this construction permit application and the information I have provided is AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN correct. ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN I agree to comply with all applicable city and county ordinances and state laws relating SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. to building construction. I authorize representatives of this city or county to enter the above -identified property CONSTRUCTION LENDING AGENCY DECLARATION for inspection purposes. California Licensed Contractor, Property Owner* or Authorized Agent**: *requires separate verification form —requires separate authorization form I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Section 3097, Civil Code). Lender's Name and Address X 1/15/2015 Name of Permittee [SIGN] Print Date INSPECTOR COPY Lender's Name & Address City State Zip ELECIHIC SPECIFICATIONS. aer.KPANELS: 1. MOUNTING PANELS SHALL BE AT LEAST 3" FROM BOTTOM OF PANELBOARD. 2. BACK PANEL SHALL BE AS CLOSE AS POSSIBLE TO THE REAR OF THE PANELBOARD. 3. INSTALL MOUNTING BACK PANELS AS LARGE AS SPACE ALLOWS IN ALL SECTION(S). D ORM: 1. INSTALL 3 -POINT LATCH(ES) ON DOOR IN FULL LENGTH PANEL SECTION(S). INSTALL 1 -PO LATCH(ES) ON ALL DOORS IN HALF LENGTH PANEL SECTION(S). 2. INSTALL POSITIVE DOOR STOPS TO HOLD ALL DOORS IN FULLY OPEN POSITION. 3. HINGED DOORS SHALL HAVE FULL LENGTH PIANO HINGES. WIRING:1, NUMBER ALL WIRE TERMINATIONS AS SHOWN, WITH BRADY MARKERS OR EQUAL. 2. INSTALL NEUTRAL BLOCK AND TERMINAL BLOCKS AS SHOWN. 3. .THE NEUTRALS FROM ALL CONTROL BRANCHES SHOULD BE HOME RUN TO THE NEUTRAL BLOCK. 4. TWO STRIPS OF WIREWAY/PANDUIT SHALL BE INSTALLED ABOVE AND BELOW TB1. THE WIREWAY/PANDUIT SHALL RUN THE WHOLE WIDTH OF THE SECTION. 5. ALL 120 VAC CONTROL WIRING, EXCEPT ON DOORS, SHALL BE RUN IN WIREWAY/PANDUIT LOCATED AS NEEDED. 6. ALL CONTROL COMPONENTS, WIRES AND TERMINATIONS SHALL BE EASILY ACCESSIBLE WITH, REMOVING ANY OTHER CONTROL COMPONENT OR THE BACK PANEL. NO WIRING OR TERMINATIONS SHALL BE BEHIND THE BACK PANEL. THERE IS NO ACCESS TO THE BACK C THE BACK OF THE PANELBOARD AFTER FIELD INSTALLATION. 7. INSTALL AND WIRE RTU PANEL WHICH WILL BE PROVIDED BY CALIFORNIA WATER SERVICE" COMPANY. 8. REFER TO DWG CW995 FOR ALL TERMINAL BLOCKS INSIDE RTU. DRAWINGS: 1. SUBMIT DRAWINGS T.0 C.W.S.C. FOR APPROVAL AT LEAST 2 WEEKS BEFORE FABRICATION. A AT LEAST -ONE WEEK FOR DRAWING APPROVAL. 200' ^- DRIVEWAY EASEMENT GATES P LAYOUT I 0 TREES m� l TREES I I `I N i I EX PG&E I POND TRANSFORMER ,I- I PROPOSED I^' METERING CABINET to NOTES I CONDUIT & SIZE PER PG&E SPECS II'- POND EX PANELBOARD CONDUIT & SIZE �� PROPOSED PER PG&E SPECS GENSET AND CONCRETE PAD EX WELL PROPOSED SOFT I STARTER ST2 PUMPHOUSE 100 i IEX PER LOCAL, NEC I REGULATIONS _ PER LOCAL, NEC ---- ' REGULATIONS _ - -PL 200 r CHICO - STATION 42 - PROPERTY PLAN (N.T.S.-DO NOT SCALE FOR TAKEOFFS) ELECIHIC SPECIFICATIONS. aer.KPANELS: 1. MOUNTING PANELS SHALL BE AT LEAST 3" FROM BOTTOM OF PANELBOARD. 2. BACK PANEL SHALL BE AS CLOSE AS POSSIBLE TO THE REAR OF THE PANELBOARD. 3. INSTALL MOUNTING BACK PANELS AS LARGE AS SPACE ALLOWS IN ALL SECTION(S). D ORM: 1. INSTALL 3 -POINT LATCH(ES) ON DOOR IN FULL LENGTH PANEL SECTION(S). INSTALL 1 -PO LATCH(ES) ON ALL DOORS IN HALF LENGTH PANEL SECTION(S). 2. INSTALL POSITIVE DOOR STOPS TO HOLD ALL DOORS IN FULLY OPEN POSITION. 3. HINGED DOORS SHALL HAVE FULL LENGTH PIANO HINGES. WIRING:1, NUMBER ALL WIRE TERMINATIONS AS SHOWN, WITH BRADY MARKERS OR EQUAL. 2. INSTALL NEUTRAL BLOCK AND TERMINAL BLOCKS AS SHOWN. 3. .THE NEUTRALS FROM ALL CONTROL BRANCHES SHOULD BE HOME RUN TO THE NEUTRAL BLOCK. 4. TWO STRIPS OF WIREWAY/PANDUIT SHALL BE INSTALLED ABOVE AND BELOW TB1. THE WIREWAY/PANDUIT SHALL RUN THE WHOLE WIDTH OF THE SECTION. 5. ALL 120 VAC CONTROL WIRING, EXCEPT ON DOORS, SHALL BE RUN IN WIREWAY/PANDUIT LOCATED AS NEEDED. 6. ALL CONTROL COMPONENTS, WIRES AND TERMINATIONS SHALL BE EASILY ACCESSIBLE WITH, REMOVING ANY OTHER CONTROL COMPONENT OR THE BACK PANEL. NO WIRING OR TERMINATIONS SHALL BE BEHIND THE BACK PANEL. THERE IS NO ACCESS TO THE BACK C THE BACK OF THE PANELBOARD AFTER FIELD INSTALLATION. 7. INSTALL AND WIRE RTU PANEL WHICH WILL BE PROVIDED BY CALIFORNIA WATER SERVICE" COMPANY. 8. REFER TO DWG CW995 FOR ALL TERMINAL BLOCKS INSIDE RTU. DRAWINGS: 1. SUBMIT DRAWINGS T.0 C.W.S.C. FOR APPROVAL AT LEAST 2 WEEKS BEFORE FABRICATION. A AT LEAST -ONE WEEK FOR DRAWING APPROVAL.