HomeMy WebLinkAboutB14-2540 (2)DEVELOPMENT SERVICES
BUTTE COUNTY AREA
DEPARTMENT OF DEVELOPMENT SERVICES 5
INSPECTION CARD MUST BE ON JOB SITE
24 Hour Inspection Line (IVR) :530.538.4365 (Cut off time for inspections is 2pm)
Development Services cannot guarantee inspections on the date reauested
Office: 530.538.7601 Fax: 530.
Permit No: B14-2540 Issued: 1/15/2015
Address: ROSE AVE, CHIC9, ,
(^tl e.c'trc'c.}ot kir IvLn- con
APN: 043-681-044
Owner: CALIFORNIA WATER SER,
Permit Type: GENERATOR COM
Description: COMM DIESEL GENERATOR W CONIC PA
538.7785 www.ButteCounty.net/dds
Flood Zone: None SRA Area: No
SETBACKS for Zoning. AG. SRA. PW
Front: Centerline of Road:
Rear: SRA:
Side: AG:
Other:
Total Setback from Centerline of Road:
ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING
Inspection Type
IVR INSP DATE
Setbacks
131
Foundations / Footings
111 _2 -
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
131
Pool Plumbing Test
Do N t Pour Concrete Until Above are Signed
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor Framing
149
Underfloor Ducts
319
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
411
612
Tiedown/Soft Set System
611
Permanent Foundation System
Do Not Install Floor Sheathing or Slab Until Above Signed
ShearwallB.W.P.-Interior
134
Shearwall/B.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
Do Not Install Siding/Stucco or Roofing Until Above Signed
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
128
Gas Piping House
403
Gas Test House
404
Serial Numbers:
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
Swimming Pools
Setbacks
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
142
Swimming Pools
Setbacks
131
Pool Plumbing Test
504
Gas Test
404
Pre-Gunite
506
Pre -Deck
505
Pool Fencing/Alarms/Barriers
503
Pre -Plaster
507
Manufactured Homes
Setbacks
131
Blocking/Underpining
612
Tiedown/Soft Set System
611
Permanent Foundation System
613
Underground Electric
218
Sewer
407
Underground Water
417
Manometer Test
605
Continuity Test
602
Skirting/Steps/Landings
610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
Insignia:
Finals
Public Works Final 538.7681
Fire Department/CDF 538.6226
Env. Health Final 538.7281
Sewer District Final
"PROJECT FINAL
-rrolecr rmai is a t ernucaic of vccupancy for txesiaennai vniyl
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
Inspector Copy
BUTTE COUNTY
DEPARTMENT OF DEVELOPMENT SERVICES
BUILDING PERMIT
24 HOUR INSPECTION (IVR)#: (530) 538-4365
OFFICE #: (530) 538-7601 FAX#: (530) 538-2140 or (530)538-7785
WEB SITE: www.buttecounty.net/dds
PROJECT INFORMATION
Site Address: ROSE AVE
Owner:
Permit No: B14-2540
APN: 043-681-044
CALIFORNIA WATER SER,
Issued Date: 1/15/2015 By: WET
Permit type: MECH ELECTRIC PLUMB
1720 NORTH FIRST STREET
Subtype: GENERATOR COM
SAN JOSE,
CA 95112
Expiration Date: 1/15/2016
Description: COMM DIESEL GENERATOR W C
(408) 367-8200
Occupancy: Zoning: SRI
Contractor
Applicant:
Square Footage:
CHICO ELECTRIC
CHEY
BOESEN
Building Garage Remdl/Addn
36 WEST EATON ROAD
36 WEST
EATON ROAD
CHICO, CA 95973
CHICO, CA 95973
Other Porch/Patio Total
(530)891-1933
(530)891-1933
FEE INFORMATION
DB CA SB1473 100% $1.00
DBMSC SUPPLEMENTAL INSPECTION, $127.00
DBA PERMIT ISSUANCE NON -RES 09 $63.00
DP PLANNING CLEARANCE FOR PERK $81.50
DBA TRAVEL DOCUMENTATION NON $95.00
DBE GENERATOR INSTLTN-PER KW T $152.40
DBE GENERATOR INSTLTN-PER KW T $228.60
DBE OTHER ELECTRICAL INSPECTIO] $127.00
DBFIRE FIRE COMM PLAN CHECK FE] $228.00
Total Charged: $1,230.50 Fees Paid: $1,230.50
DBMSC SPLMNTL PC/HR 4+ PREPOST $127.00
Balance Due: $0.00 Job Value: $7,500.00
LICENSED CONTRACTOR'S DECLARATION
OWNER / BUILDER DECLARATION
Contractor (Name) State Contractors License No. / Class / Expires
I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for
CHICO ELECTRIC 454345 / B C10 / 4/30/2016
the reason(s) indicated below by the checkmark(s) I have placed next to the applicable item(s)
(Section 7031.5, Business and Professions Code: Any city or county that requires a permit to
construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the
applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions
I HEREBY AFFIRM UNDER PENALTY OF PERJURY that I am licensed under provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license
is in full force and effect.
of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the
Business and Professions Code) or that he or she is exempt from licensure and the basis for the
X 1/15/2015
alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant
to a civil penalty of not more than five hundred dollars ($500).):
❑1, as owner of the property, or my employees with wages as their sole compensation,
will do U all of or L) portions of the work, and the structure is not intended or offered for
sale (Section 7044, Business and Professions Code: The Contractors' State License Law does
not apply to an owner of property who, through employees' or personal effort, builds or
improves the property, provided that the improvements are not intended or offered for sale. If,
Contractor's Signature Date
WORKERS' COMPENSATION DECLARATION
I HEREBY AFFIRM UNDER PENALTY OF PERJURY one of the following declarations:
however, the building or improvement is sold within one year of completion, the Owner -Builder
❑I have and will maintain a certificate of consent to self4nsure for workers'
will have the burden of proving that it was not built or
compensation, issued by the Director of Industrial Relations as provided for by Section
improved for the purpose of sale.).
3700 of the Labor Code, for the performance of the work for which this permit is issued.
Policy No.11I,
as owner of the property, am exclusively contracting with licensed Contractors to
❑construct
I have and will maintain workers' compensation insurance, as required by Section 3700
the project (Section 7044, Business and Professions Code: The Contractors' State
License Law does not apply to an owner of property who builds or improves thereon, and who
of the Labor Code, for the performance of the work for which this permit is issued. My workers'
contracts for the projects with a licensed Contractor pursuant to the Contractors' State License
compensation insurance carrier and policy number are:
Law.).
Carrier: SELF INSURANCE policy Number: 2246 Exp. Date: 1/1/2016
I am exempt from licensure under the Contractors' State License Law for the following
❑reason:
I certify that, in the performance of the work for which this permit is issued, I shall not
1/15/2015
X
employ any person in any manner so as to become subject to the workers'
compensation laws of California, and agree that, if I should become subject to the workers'
compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with
Owner's Signature Date
those provisions.
PERMIT APPLICANT DECLARATION
X 1/15/2015
Signature Date
By my signature below, I certify to each of the following:
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS
I am U a California licensed contractor or U the property owner* or U authorized to
UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES
act on the property owner's behalf**.
I have read this construction permit application and the information I have provided is
AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN
correct.
ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
I agree to comply with all applicable city and county ordinances and state laws relating
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
to building construction.
I authorize representatives of this city or county to enter the above -identified property
CONSTRUCTION LENDING AGENCY DECLARATION
for inspection purposes. California Licensed Contractor, Property Owner* or Authorized
Agent**: *requires separate verification form —requires separate authorization form
I hereby affirm under penalty of perjury that there is a construction lending agency for the
performance of the work for which this permit is issued (Section 3097, Civil Code).
Lender's Name and Address
X 1/15/2015
Name of Permittee [SIGN] Print Date
INSPECTOR COPY
Lender's Name & Address City State Zip
ELECIHIC SPECIFICATIONS.
aer.KPANELS:
1. MOUNTING PANELS SHALL BE AT LEAST 3" FROM BOTTOM OF PANELBOARD.
2. BACK PANEL SHALL BE AS CLOSE AS POSSIBLE TO THE REAR OF THE PANELBOARD.
3. INSTALL MOUNTING BACK PANELS AS LARGE AS SPACE ALLOWS IN ALL SECTION(S).
D ORM:
1. INSTALL 3 -POINT LATCH(ES) ON DOOR IN FULL LENGTH PANEL SECTION(S). INSTALL 1 -PO
LATCH(ES) ON ALL DOORS IN HALF LENGTH PANEL SECTION(S).
2. INSTALL POSITIVE DOOR STOPS TO HOLD ALL DOORS IN FULLY OPEN POSITION.
3. HINGED DOORS SHALL HAVE FULL LENGTH PIANO HINGES.
WIRING:1, NUMBER ALL WIRE TERMINATIONS AS SHOWN, WITH BRADY MARKERS OR EQUAL.
2. INSTALL NEUTRAL BLOCK AND TERMINAL BLOCKS AS SHOWN.
3. .THE NEUTRALS FROM ALL CONTROL BRANCHES SHOULD BE HOME RUN TO THE NEUTRAL
BLOCK.
4. TWO STRIPS OF WIREWAY/PANDUIT SHALL BE INSTALLED ABOVE AND BELOW TB1. THE
WIREWAY/PANDUIT SHALL RUN THE WHOLE WIDTH OF THE SECTION.
5. ALL 120 VAC CONTROL WIRING, EXCEPT ON DOORS, SHALL BE RUN IN WIREWAY/PANDUIT
LOCATED AS NEEDED.
6. ALL CONTROL COMPONENTS, WIRES AND TERMINATIONS SHALL BE EASILY ACCESSIBLE WITH,
REMOVING ANY OTHER CONTROL COMPONENT OR THE BACK PANEL. NO WIRING OR
TERMINATIONS SHALL BE BEHIND THE BACK PANEL. THERE IS NO ACCESS TO THE BACK C
THE BACK OF THE PANELBOARD AFTER FIELD INSTALLATION.
7. INSTALL AND WIRE RTU PANEL WHICH WILL BE PROVIDED BY CALIFORNIA WATER SERVICE"
COMPANY.
8. REFER TO DWG CW995 FOR ALL TERMINAL BLOCKS INSIDE RTU.
DRAWINGS:
1. SUBMIT DRAWINGS T.0 C.W.S.C. FOR APPROVAL AT LEAST 2 WEEKS BEFORE FABRICATION. A
AT LEAST -ONE WEEK FOR DRAWING APPROVAL.
200'
^- DRIVEWAY
EASEMENT
GATES
P LAYOUT
I 0
TREES
m�
l TREES
I
I
`I
N
i
I
EX PG&E
I POND
TRANSFORMER
,I-
I
PROPOSED
I^'
METERING CABINET
to
NOTES
I
CONDUIT & SIZE
PER PG&E SPECS
II'-
POND EX PANELBOARD
CONDUIT & SIZE
�� PROPOSED
PER PG&E SPECS
GENSET AND
CONCRETE PAD
EX WELL
PROPOSED SOFT
I
STARTER ST2
PUMPHOUSE
100
i
IEX
PER LOCAL, NEC
I
REGULATIONS
_
PER LOCAL, NEC
---- '
REGULATIONS
_
- -PL 200 r
CHICO
-
STATION
42 - PROPERTY PLAN
(N.T.S.-DO NOT SCALE FOR TAKEOFFS)
ELECIHIC SPECIFICATIONS.
aer.KPANELS:
1. MOUNTING PANELS SHALL BE AT LEAST 3" FROM BOTTOM OF PANELBOARD.
2. BACK PANEL SHALL BE AS CLOSE AS POSSIBLE TO THE REAR OF THE PANELBOARD.
3. INSTALL MOUNTING BACK PANELS AS LARGE AS SPACE ALLOWS IN ALL SECTION(S).
D ORM:
1. INSTALL 3 -POINT LATCH(ES) ON DOOR IN FULL LENGTH PANEL SECTION(S). INSTALL 1 -PO
LATCH(ES) ON ALL DOORS IN HALF LENGTH PANEL SECTION(S).
2. INSTALL POSITIVE DOOR STOPS TO HOLD ALL DOORS IN FULLY OPEN POSITION.
3. HINGED DOORS SHALL HAVE FULL LENGTH PIANO HINGES.
WIRING:1, NUMBER ALL WIRE TERMINATIONS AS SHOWN, WITH BRADY MARKERS OR EQUAL.
2. INSTALL NEUTRAL BLOCK AND TERMINAL BLOCKS AS SHOWN.
3. .THE NEUTRALS FROM ALL CONTROL BRANCHES SHOULD BE HOME RUN TO THE NEUTRAL
BLOCK.
4. TWO STRIPS OF WIREWAY/PANDUIT SHALL BE INSTALLED ABOVE AND BELOW TB1. THE
WIREWAY/PANDUIT SHALL RUN THE WHOLE WIDTH OF THE SECTION.
5. ALL 120 VAC CONTROL WIRING, EXCEPT ON DOORS, SHALL BE RUN IN WIREWAY/PANDUIT
LOCATED AS NEEDED.
6. ALL CONTROL COMPONENTS, WIRES AND TERMINATIONS SHALL BE EASILY ACCESSIBLE WITH,
REMOVING ANY OTHER CONTROL COMPONENT OR THE BACK PANEL. NO WIRING OR
TERMINATIONS SHALL BE BEHIND THE BACK PANEL. THERE IS NO ACCESS TO THE BACK C
THE BACK OF THE PANELBOARD AFTER FIELD INSTALLATION.
7. INSTALL AND WIRE RTU PANEL WHICH WILL BE PROVIDED BY CALIFORNIA WATER SERVICE"
COMPANY.
8. REFER TO DWG CW995 FOR ALL TERMINAL BLOCKS INSIDE RTU.
DRAWINGS:
1. SUBMIT DRAWINGS T.0 C.W.S.C. FOR APPROVAL AT LEAST 2 WEEKS BEFORE FABRICATION. A
AT LEAST -ONE WEEK FOR DRAWING APPROVAL.