HomeMy WebLinkAboutB19-2658 (2)BUTTE COUNTY
DEPARTMENT OF DEVELOPMENT SERVICES
INSPECTION CARD MUST BE ON JOB SITE
24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm)
Development Services cannot guarantee inspections on the date requested
Office: 530.552.3700. Fax: 530.538.7785 www.ButteCountv.net/dds
Permit No: B19-2658 Issued: 11/6/2019
APN: 064-330-015
Address: 14247 SHERWOOD CIR, MAGALIA
Owner: ROBERTSON BARBARA J REVOCABLE
Permit Type: SFD-MOBILE HOME PFS
Description: MHI PFS (1222) 433A CAMP FIRE REBUILD
AREA
Flood Zone: N SRA Area: Y
SETBACKS for Zoning, AG. SRA. PW
Front: Centerline of Road:
Rear: SRA:
Street: AG:
Interior
Total Setback from Centerline of Road:
ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING
Inspection Type
IVR INSP DATE
Setbacks
131
Foundations / Footings
111
Pier/Column Footings
1.22
Eufer Ground
216
Masonry Grout
120
Tiedown/Soft Set System
611
Do Not Pour Concrete Until Above are Signed
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor Framing
149
Underfloor Ducts
319
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
41.1
Manufactures Name:
v c[rti
Date of Manufacture: J-�
Do Not Install Floor Sheathing or Slab Until Above Signed
ShearwallB.W.P.-Interior
134
ShearwallB.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
Do Not Install Siding/Stucco or Roofing Until Above Signed
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
1.28
Gas Piping House
403
Gas Test House
404
Shower Pan/Tub Test
408
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
Blockin /Unde inin
612
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
Bldg Permit: g
Setbaa Address:
Pool P,
_ ,142
OFFICE COPY
Gas Te
Pre -Gu GAS By: Date:
Pre -De
Pool Fi Electric By: Dater -n
Pre-Pla
Manufactured Homes
Setbacks
131
Blockin /Unde inin
612
Tiedown/Soft Set System
611
Permanent Foundation System 613
Underground Electric
218
Sewer
407
Underground Water
417 -[
Manometer Test
605
Continuity Test
602 /
Skirting/Steps/Landings
610
Coach Info
Manufactures Name:
v c[rti
Date of Manufacture: J-�
Model Name/Number:
Serial Numbers:
Length x Width:
insignia:
Public Works Final
538.7681
Fire De artment/CDF
538.6226
Env. Health Final
538.7281
Sewer District Final
**PROJECT FINAL
*Project Final is a Certificate of Occupancy for (Residential Only)
PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
- xkf <
BUTTE COUNTY
DEPARTMENT OF DEVELOPMENT SERVICES
INSPECTION CARD MUST BE ON JOB SITE
24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 3pm)
Development Services cannot guarantee inspections on the date requested
Office: 530.552.3700 Fax: 530.538.7785 www.ButteCountv.net/dds
Permit No: B19-2658 Issued: 11/6/2019
APN: 064-330-015
Address: 14247 SHERWOOD CIR, MAGALIA
Owner: ROBERTSON BARBARA J REVOCABLE
Permit Type: SFD-MOBILE HOME PFS
Description: MHI PFS (1222) 433A CAMP FIRE REBUILD
Flood Zone: N SRA Area: Y
SETBACKS for Zoning, AG, SRA, PW
Front: Centerline of Road:
Rear: SRA:
Street: AG:
Interior
Total Setback from Centerline of Road:
ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING
Inspection Type
IVR INSP DATE
Setbacks
131
Foundations / Footings
111
Pier/Column Footings
122
Eufer Ground
216
Masonry Grout
120
Setbacks
131
Do Not Pour Concrete Until Above are Signed
Pre -Slab
124
Gas Test Underground/floor
404
Gas Piping Underground/floor
403
Underfloor Framing
149
Underfloor Ducts
319
Shear Transfer
136
Under Floor Plumbing
412
Under Slab Plumbing
411
Blockin /Under inin
612
Tiedown/Soft Set System
611
Do Not Install Floor Sheathing or Slab Until Above Signed
Shearwall/B.W.P.-Interior
134
Shearwall/B.W.P.-Exterior
135
Roof Nail/Drag Trusses
129
417
Manometer Test
Do Not Install Siding/Stucco or Roofing Until Above Signed
Rough Framing
153
Rough Plumbing
406
Rough Mechanical
316
Rough Electrical
208
4 -Way Rough Framing
1.28
Gas Piping House
403
Gas Test House
404
Shower Pan/Tub Test
408
Do Not Insulate Until Above Signed
Permit Final
802
Electrical Final
803
Mechanical Final
809
Plumbing Final
813
Fire Sprinkler Test or Final
702
Swimming
Pools
Inspection Type
IVR INSP DATE
T -Bar Ceiling
145
Stucco Lath
142
Sewer District Final
Swimming
Pools
Setbacks
131
Pool Plumbing Test
504
Gas Test
404
Pre-Gunite
506
Pre -Deck
505
Pool Fencing/Alarms/Barriers
503
Pre -Plaster
507
Manufactured Homes
Setbacks
131
Blockin /Under inin
612
Tiedown/Soft Set System
611
Permanent Foundation System
613
Underground Electric
218
Sewer
407
Underground Water
417
Manometer Test
605
Continuity Test
602
Skirtin /Ste s/Landin s
610
Coach Info
Manufactures Name:
Date of Manufacture:
Model Name/Number:
Serial Numbers:
Length x Width:
insignia:
Public Works Final
538.7681
Fire De artment/CDF
538.6226
Env. Health Final
538.7281
Sewer District Final
"PROJECT FINAL
*Project Final is a Certificate of Occupancy for (Residential Only)
PERMITS BECOME NULL AND VOID I YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR
RENEWAL 30 DAYS PRIOR TO EXPIRATION
COUNTY OF BUTTE
BUILDING DIVISION
DEPARTMENT OF DEVELOPMENT SERVICES
7 County Center Drive • Oroville, CA • (530) 538-7601
CORRECTION NOTICE
,) H Zq7 S herw,v-nd ci trik N5- 2/1-r5 �5_
ADDRESS PERMIT NO.
A routine inspection indicates that the following violations of Butte County Ordinances exist
at the above address and should be corrected. Please call for re -inspection when correction
of work is completed. If you have any questions pertaining to this matter, or need additional
explanation, please contact the Building Inspector as indicated below.
INSPECTION TYPE:Mi'
1#, -s4 t.F' Jryiri l,,t +o Viii-aiY)n t� Tf"x,rku°vj
Datet �`�► ` Inspector
REV 7/16 Phone #' " 2�
FOR RE -INSPECTION CALL: 538-4365 IVR SYSTEM