Loading...
HomeMy WebLinkAboutB15-1851 (2)BUTTE COUNTY AREA DEPARTMENT OF DEVELOPMENT SERVICES 5 INSPECTION CARD MUST BE ON JOB SITE 24 Hour Inspection Line (IVR) : 530.538.4365 (Cut off time for inspections is 2pm) Development Services cannot guarantee inspections on the date requested Office: 530.538.7601 Fax:.9 Permit No: B15-1851 Issued: 8/21/201512: Address: 8050 WILSON LANDING RD, CHICO APN: 047-040-003 Owner: FARMLAND RESERVE INC Permit Type: RETAINING WALL Description: TRUCK SCALE (880) W ELEC 0.538.7785 www.ButteCounty.net/dds Flood Zone: A SRA Area: No SFTBACKS for Zoning, AG. SRA. PW Front: 20 Centerline of Road: Rear: 25 SRA: Side: 20 AG: Other: 25 Total Setback from Centerline of Road: ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Insipection Tvve IVR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Do Not Pour Concrete Until Above are Sign d Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Do Not Install Floor Sheathing or Slab Until Above Signed ShearwallB.W.P.-Interior 134 ShearwallB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 SWimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Ma Lumomes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final **PROJECT FINAL -rrojrci renal is at • Cruucace ui uccupancy for knesmenual umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION ALL PLAN REVISIONS MUST BE APPROVED BY THE COUNTY BEFORE PROCEEDING Insipection Tvve IVR INSP DATE Setbacks 131 Foundations / Footings 111 Pier/Column Footings 122 Eufer Ground 216 Masonry Grout 120 Do Not Pour Concrete Until Above are Sign d Pre -Slab 124 Gas Test Underground/floor 404 Gas Piping Underground/floor 403 Underfloor Framing 149 Underfloor Ducts 319 Shear Transfer 136 Under Floor Plumbing 412 Under Slab Plumbing 411 Do Not Install Floor Sheathing or Slab Until Above Signed ShearwallB.W.P.-Interior 134 ShearwallB.W.P.-Exterior 135 Roof Nail/Drag Trusses 129 Do Not Install Siding/Stucco or Roofing Until Above Signed Rough Framing 153 Rough Plumbing 406 Rough Mechanical 316 Rough Electrical 208 4 -Way Rough Framing 128 Gas Piping House 403 Gas Test House 404 Shower Pan/Tub Test 408 Do Not Insulate Until Above Signed Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 SWimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Ma Lumomes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final **PROJECT FINAL -rrojrci renal is at • Cruucace ui uccupancy for knesmenual umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION Permit Final 802 Electrical Final 803 Mechanical Final 809 Plumbing Final 813 Fire Sprinkler Test or Final 702 Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 SWimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Ma Lumomes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final **PROJECT FINAL -rrojrci renal is at • Cruucace ui uccupancy for knesmenual umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION Inspection Type IVR INSP DATE T -Bar Ceiling 145 Stucco Lath 142 SWimming Pools Setbacks 131 Pool Plumbing Test 504 Gas Test 404 Pre-Gunite 506 Pre -Deck 505 Pool Fencing/Alarms/Barriers 503 Pre -Plaster 507 Ma Lumomes Setbacks 131 Blockin nder inin 612 Tiedown/Soft Set System 611 Permanent Foundation System 613 Underground Electric 218 Sewer 407 Underground Water 417 Manometer Test 605 Continuity Test 602 Skirtin Ste s/Landin s 610 Coach Info Manufactures Name: Date of Manufacture: Model Name/Number: Serial Numbers: Length x Width: Insignia: Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final **PROJECT FINAL -rrojrci renal is at • Cruucace ui uccupancy for knesmenual umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION Finals Public Works Final 538.7681 Fire De artment/CDF 538.6226 Env. Health Final 538.7281 Sewer District Final **PROJECT FINAL -rrojrci renal is at • Cruucace ui uccupancy for knesmenual umy) PERMITS BECOME NULL AND VOID 1 YEAR FROM THE DATE OF ISSUANCE. IF WORK HAS COMMENCED, YOU MAY PAY FOR A 1 YEAR RENEWAL 30 DAYS PRIOR TO EXPIRATION