Loading...
HomeMy WebLinkAbout10.01.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Cannon, Jamie; Loeser, Kamie Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, October 1, 2026 3:37:20 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, October 1, 2026 12:06 PM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 06/15/2027 to address FERC's Comment 2 re an updated Probable Maximum Flood Study et al. re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20261001- 5259__;!!KNMwiTCp4spf!BprAw-95KqlhlJ-wFg1-wMs8PqZzurtN-98pIj3rbLROHRy- R9K8n1rdhlgRgyZYdNb8rJ77cfThHeHSwtRbBmqWyDL6tHsqQ35h$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!BprAw-95KqlhlJ- wFg1-wMs8PqZzurtN-98pIj3rbLROHRy-R9K8n1rdhlgRgyZYdNb8rJ77cfThHeHSwtRbBmqWyDL6tG3GSu_c$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BprAw-95KqlhlJ-wFg1- wMs8PqZzurtN-98pIj3rbLROHRy-R9K8n1rdhlgRgyZYdNb8rJ77cfThHeHSwtRbBmqWyDL6tMS1BLcB$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 1, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Updated Probable Maximum Flood Study – FERC Comment 2 Second Part 12D Inspection – Recommendations 14 and 15 Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to address the Federal Energy Regulatory Commission’s (FERC) Comment 2 (C-2) from a letter dated August 10, 2021, and Recommendations 14 and 15 (R-14 and R-15) from the second Part 12D safety inspection report (dated November 2, 2020) for Round Valley Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. In accordance with Title 18 of the Code of Federal Regulations, Section 12.40(d), PG&E has included a reasoned basis for this extension of time request. PG&E submitted its initial plan and schedule to address C-2 in a letter dated August 31, 2021; PG&E submitted its initial plan and schedule for addressing R-14 and R-15 in a letter dated December 31, 2020. PG&E’s most recent transmittal, dated March 27, 2024, included extension of time requests for C-2, R-14, and R-15. The extension of time requests for C-2, R-14, and R-15 and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request