Loading...
HomeMy WebLinkAbout09.30.26 Board Correspondence - FW_ Government Agency Submittal submitted in FERC P-2107-052 by Forest Service, Pacific Southwest Region, Public ServicesFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Government Agency Submittal submitted in FERC P-2107-052 by Forest Service, Pacific Southwest Region, Public Services Date:Wednesday, September 30, 2026 8:07:38 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, September 30, 2026 6:06 AM Subject: Government Agency Submittal submitted in FERC P-2107-052 by Forest Service, Pacific Southwest Region, Public Services .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Forest Service, Pacific Southwest Region, Public Services Docket(s): P-2107-052 Lead Applicant: Pacific Gas and Electric Company Filing Type: Government Agency Submittal Other External Submittal Description: The U. S. Forest Service, Pacific Southwest Region, Plumas National Forest submits letter to Pacific Gas & Electric Company providing comments on the draft Poe Hiking Trail 90% Design proposal re the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260930- 5014__;!!KNMwiTCp4spf!DbUoeTa07lnu0jIvDixbV2Edb4zP6509UGPDjbEfres86l5JCzvey-IunXZ8rEi8fmGlgWzq9s46frqfX3xAcCzOw7014HWkGolU$ To modify your subscriptions, click here: IunXZ8rEi8fmGlgWzq9s46frqfX3xAcCzOw7014NkBPilm$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DbUoeTa07lnu0jIvDixbV2Edb4zP6509UGPDjbEfres86l5JCzvey- IunXZ8rEi8fmGlgWzq9s46frqfX3xAcCzOw7014JInqAuQ$ or for phone support, call 866-208-3676. United States Department of Agriculture Forest Service National Forest Quincy, CA 95971-6025 (530)283-2050 Voice Caring for the Land and Serving People Printed on Recycled Paper File Code: 2770 Date: September 22, 2026 Anna Urias Hydro License Coordinator I Power Generation Land Planner, Environmental Management Pacific Gas & Electric Company AXUS@PGE.COM RE: POE HIKING TRAIL 90% DESIGN, (FERC NO. 2107) POE HYDROELECTRIC PROJECT Dear Ms. Urias, The Plumas National Forest (PNF) is providing feedback and comments regarding the draft Poe Hiking Trail 90% Design proposal located on the Feather River Ranger District, for the Poe Hydroelectric Project (FERC NO. 2107). The PNF has reviewed the draft 90% design and proposed route location on National Forest System (NFS) lands. The proposed route location on NFS land is aligned with initial ground truthing conducted by PNF staff in April 2024, enabling route sustainability and enhancing recreational trail opportunities in the lower North Fork Feather River Canyon. Included below are PNF comments on the 90% design: •The trail is designed as a class 2 trail. The USFS is not opposed to a higher-class trail for construction, even if it is maintained as a class 2 trail since the higher-class construction will likely be more sustainable long term (plan set page 2). •The plans need to show a typical rolling dip with reverse grade to remove water (plan set page 4). Link to rolling dip diagram STD 927-01 and 927-02 are available online at www.fs.usda.gov/managing-land/trails/trail-management-tools/trailplans . •The plans state that the trail will be full-bench construction. Plans do not identify where cut materials will be placed if not a balanced cut-and-fill section. Identified locations should be included in the 90% design (General construction notes item 7, plan set page 3). •In addition to using native rock sourced on or near each site, rock-armored stream crossings should include option for use of imported rock material as needed, if not available on site (plan set page 4). Any imported rock material should match what is found in the general area of the proposed trail. • A Forest Service site representative, in coordination with a PG&E site representative, should be included in the ground review and approval of the final project layout (flagging, staking) and periodic on the ground review during the trail construction phase (plan set page 3). During trail construction, PG&E should provide the Forest Service and other cooperators with weekly or bi-weekly construction progress reports (plan set page 3). • The plans use passive language when providing construction directives. Please remove passive wording and state what is required. For example, change “spoils should be mulched” to “mulch spoils”. (General construction notes item 10, plan set page 3). • After our comments that the 30 and 60% plans access the river at an identified village site, it appears that river access is still not included in the 90% plan. This is not an acceptable option for the Forest Service. If access to the river is not part of the trail as constructed, people will inevitably create their own access from the trail to the water. This could result in multiple user-created social paths to the water and impacts to known or unknown cultural resources. We suggest a clear path accessing the river be included somewhere before the known resource and somewhere after, so that people are led away from the resource. • River travelers have used the beach in question without serious impacts for years. If the trail is designed appropriately, looting, vandalism, and other impacts to cultural resources can be avoided. Using vegetation design to conceal the beach from the casual observer may be considered. • During Forest Service discussions with Konkow Valley Band of Maidu Indians (KVBMI), river access trails are supported by KVBMI. • Any vegetation clearance needed during project planning and surveys should be the minimum needed to complete planning and surveys with no tree removal, avoiding known sensitive resources, and all cut vegetation being lopped and scattered. The PNF looks forward to continuing to work with PG&E in final planning for the proposed Poe Hiking trail. If you have any questions or comments, please contact Chuck James, Acting Public Service Staff Officer at (530) 283-7755 or email charles.james@usda.gov . Sincerely, WADE McMASTER Acting Forest Supervisor cc: Jacqueline Phipps, Kurt Sable, Jason Vermillion, Clay Davis