HomeMy WebLinkAbout09.28.26 Board Correspondence - FW_ Delegated Order issued in FERC P-803-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-803-000
Date:Monday, September 28, 2026 12:33:30 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, September 28, 2026 11:57 AM
Subject: Delegated Order issued in FERC P-803-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 9/28/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter authorizing Pacific Gas and Electric Company to proceed with the Phase 1.3 Overhead Portion of the Oro Fino Underground Project on the DeSabla Forebay Dam, part of the DeSabla-Centerville
Hydroelectric Project under P-803.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260928-
3106__;!!KNMwiTCp4spf!HrOj3FD6ZDGW0TidWe91f8QgBy6m2JUKHyrVnu4glq7i5ZPz6sYmJItzXFlaLrT2X5h2xVb20fe8b9L1fPG145xFnb7Nhks-Ce_5$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HrOj3FD6ZDGW0TidWe91f8QgBy6m2JUKHyrVnu4glq7i5ZPz6sYmJItzXFlaLrT2X5h2xVb20fe8b9L1fPG145xFnb7NhiSOIyol$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
Document Accession #: 20260923-5009 Filed Date: 09/23/2026
Power Generation 300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
September 22, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Philbrook Dam, NATDAM No. CA00345
2025 Annual FERC Inspection – Action Item 3 and FERC Comment 1
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time
to address Action Item 3 (I-3) and the Federal Energy Regulatory Commission’s (FERC) follow-up
Comment 1 (C-1) related to the 2025 annual FERC dam safety inspection of PG&E’s DeSabla-
Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. I-3
and C-1 are regarding Philbrook Dam. Included with PG&E’s extension of time request is a
reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d).
PG&E submitted its original plan and schedule for addressing I-3 to FERC in a letter dated
September 4, 2025. FERC provided C-1 in a letter to PG&E dated March 4, 2026, to which PG&E
responded with an updated plan and schedule for I-3 in a letter dated April 2, 2026.
The extension of time request and reason for the request are enclosed with this letter (Enclosure 1).
Should you have technical questions concerning this matter, please contact Isabelle Rawlings,
senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact
Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request for Action Item 3 and FERC Comment 1 Related to the 2025
Annual FERC Dam Safety Inspection
Document Accession #: 20260923-5009 Filed Date: 09/23/2026
Document Content(s)
PGE20260922_803_Philbrook_2025DSI_I3_C1_EOT_Ltr.pdf ......................1