Loading...
HomeMy WebLinkAbout09.28.26 Board Correspondence - FW_ Delegated Order issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-803-000 Date:Monday, September 28, 2026 12:33:30 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, September 28, 2026 11:57 AM Subject: Delegated Order issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/28/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter authorizing Pacific Gas and Electric Company to proceed with the Phase 1.3 Overhead Portion of the Oro Fino Underground Project on the DeSabla Forebay Dam, part of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260928- 3106__;!!KNMwiTCp4spf!HrOj3FD6ZDGW0TidWe91f8QgBy6m2JUKHyrVnu4glq7i5ZPz6sYmJItzXFlaLrT2X5h2xVb20fe8b9L1fPG145xFnb7Nhks-Ce_5$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HrOj3FD6ZDGW0TidWe91f8QgBy6m2JUKHyrVnu4glq7i5ZPz6sYmJItzXFlaLrT2X5h2xVb20fe8b9L1fPG145xFnb7NhiSOIyol$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov Document Accession #: 20260923-5009 Filed Date: 09/23/2026 Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 22, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 2025 Annual FERC Inspection – Action Item 3 and FERC Comment 1 Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to address Action Item 3 (I-3) and the Federal Energy Regulatory Commission’s (FERC) follow-up Comment 1 (C-1) related to the 2025 annual FERC dam safety inspection of PG&E’s DeSabla- Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. I-3 and C-1 are regarding Philbrook Dam. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted its original plan and schedule for addressing I-3 to FERC in a letter dated September 4, 2025. FERC provided C-1 in a letter to PG&E dated March 4, 2026, to which PG&E responded with an updated plan and schedule for I-3 in a letter dated April 2, 2026. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request for Action Item 3 and FERC Comment 1 Related to the 2025 Annual FERC Dam Safety Inspection Document Accession #: 20260923-5009 Filed Date: 09/23/2026 Document Content(s) PGE20260922_803_Philbrook_2025DSI_I3_C1_EOT_Ltr.pdf ......................1