Loading...
HomeMy WebLinkAbout09.23.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Pickett, Andy; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Cannon, Jamie; Loeser, Kamie Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Wednesday, September 23, 2026 9:46:24 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, September 23, 2026 6:06 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/23/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 01/31/2027 to address Action Item 3 and Comment 1 re the 2025 Annual Dam Safety Inspection of the Philbrook Dam of the DeSabla-Centerville Hydro Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260923- 5009__;!!KNMwiTCp4spf!Ha1CgEYp8z9vqoJCQd31VvIEewh3gd9xSMWRbYO9Vtdehpek_Xi6a1fqSo2olC_I5H8Bgu-RQmblr8ebFXSoAag5Iaj2QuRsBlZt$ To modify your subscriptions, click here: RQmblr8ebFXSoAag5Iaj2QpnDhe00$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Ha1CgEYp8z9vqoJCQd31VvIEewh3gd9xSMWRbYO9Vtdehpek_Xi6a1fqSo2olC_I5H8Bgu- RQmblr8ebFXSoAag5Iaj2QulS_HCO$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 September 22, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 2025 Annual FERC Inspection – Action Item 3 and FERC Comment 1 Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to address Action Item 3 (I-3) and the Federal Energy Regulatory Commission’s (FERC) follow-up Comment 1 (C-1) related to the 2025 annual FERC dam safety inspection of PG&E’s DeSabla- Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. I-3 and C-1 are regarding Philbrook Dam. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted its original plan and schedule for addressing I-3 to FERC in a letter dated September 4, 2025. FERC provided C-1 in a letter to PG&E dated March 4, 2026, to which PG&E responded with an updated plan and schedule for I-3 in a letter dated April 2, 2026. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request for Action Item 3 and FERC Comment 1 Related to the 2025 Annual FERC Dam Safety Inspection