HomeMy WebLinkAbout10.13.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater,
Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company
Date:Tuesday, October 13, 2026 8:27:13 AM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, October 13, 2026 8:26 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or
replying..
On 10/13/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Periodic Inspection Report for the Third Part 12D Inspection re the Round Valley Dam
of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20261013-
5158__;!!KNMwiTCp4spf!B2wKld9zPrZbEhC5wrmNLSoH1i7r3eM0IatuY-lFWHMjVPUdUpLDo1wFF-ltMUAGH45oB04eI-
wy4pZwpVI0Bq9EmiEh0cFtTIk_$
To modify your subscriptions, click here:
lFWHMjVPUdUpLDo1wFF-ltMUAGH45oB04eI-wy4pZwpVI0Bq9EmiEh0QAp-_4L$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!B2wKld9zPrZbEhC5wrmNLSoH1i7r3eM0IatuY-
lFWHMjVPUdUpLDo1wFF-ltMUAGH45oB04eI-wy4pZwpVI0Bq9EmiEh0Q395H1L$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
October 12, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Third Part 12D Inspection – Periodic Inspection Report
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents the periodic inspection (PI) report for the third Part 12D Safety Inspection for
Round Valley Dam, which is part of Pacific Gas and Electric Company’s (PG&E) DeSabla-Centerville
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The report was
prepared in accordance with Title 18 of the Code of Federal Regulations (CFR), Section 12.36. FERC
authorized the inspection plan and Independent Consultant (IC) team for this dam in a letter to PG&E
dated February 24, 2026. PG&E provided the PI pre-inspection preparation report to FERC in a letter
dated December 25, 2025, with a revision submitted on February 5, 2026.
The PI report is enclosed with this letter for FERC review (Enclosure 1). In accordance with Title 18 of
the CFR, Section 12.41, PG&E will prepare plans and schedules for addressing IC recommendations.
PG&E will submit the plans and schedules to FERC by December 12,2026.
Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior
dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew
Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Third Part 12D Safety Inspection, Period Inspection Report, Round Valley Dam, prepared by
Geosyntec and dated October 2026.
cc: See Attached List
Frank L. Blackett, P.E. Regional Engineer
October 12, 2026
Page 2
cc: via hard copy w/enclosure
Erik Malvick, Ph.D., P.E., G.E., Division Manager
Department of Water Resources, Division of Safety of Dams
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833