Loading...
HomeMy WebLinkAbout10.13.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Tuesday, October 13, 2026 8:27:13 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, October 13, 2026 8:26 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/13/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Periodic Inspection Report for the Third Part 12D Inspection re the Round Valley Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20261013- 5158__;!!KNMwiTCp4spf!B2wKld9zPrZbEhC5wrmNLSoH1i7r3eM0IatuY-lFWHMjVPUdUpLDo1wFF-ltMUAGH45oB04eI- wy4pZwpVI0Bq9EmiEh0cFtTIk_$ To modify your subscriptions, click here: lFWHMjVPUdUpLDo1wFF-ltMUAGH45oB04eI-wy4pZwpVI0Bq9EmiEh0QAp-_4L$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!B2wKld9zPrZbEhC5wrmNLSoH1i7r3eM0IatuY- lFWHMjVPUdUpLDo1wFF-ltMUAGH45oB04eI-wy4pZwpVI0Bq9EmiEh0Q395H1L$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 12, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Third Part 12D Inspection – Periodic Inspection Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the periodic inspection (PI) report for the third Part 12D Safety Inspection for Round Valley Dam, which is part of Pacific Gas and Electric Company’s (PG&E) DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The report was prepared in accordance with Title 18 of the Code of Federal Regulations (CFR), Section 12.36. FERC authorized the inspection plan and Independent Consultant (IC) team for this dam in a letter to PG&E dated February 24, 2026. PG&E provided the PI pre-inspection preparation report to FERC in a letter dated December 25, 2025, with a revision submitted on February 5, 2026. The PI report is enclosed with this letter for FERC review (Enclosure 1). In accordance with Title 18 of the CFR, Section 12.41, PG&E will prepare plans and schedules for addressing IC recommendations. PG&E will submit the plans and schedules to FERC by December 12,2026. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Third Part 12D Safety Inspection, Period Inspection Report, Round Valley Dam, prepared by Geosyntec and dated October 2026. cc: See Attached List Frank L. Blackett, P.E. Regional Engineer October 12, 2026 Page 2 cc: via hard copy w/enclosure Erik Malvick, Ph.D., P.E., G.E., Division Manager Department of Water Resources, Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833