HomeMy WebLinkAbout09.30.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Dubose, Teri; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts,
Melissa; Krater, Sharleen; Lee, Lewis; Ritter, Tami; Simmons, Katie; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda,
Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company
Date:Wednesday, September 30, 2026 9:55:51 AM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, September 30, 2026 9:46 AM
Subject: Dam Safety Compliance Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on
links, or replying..
On 9/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits the 90% Design Progress Report for the Poe Hiking Trail at the Poe Dam of
the Poe Hydroelectric Project under P-2107.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20260930-5101__;!!KNMwiTCp4spf!BhNBf8Z5DimqcMZkwBE6gor2QOBT-
uppwQRFYZEbK8RzkWpxMVQCNbKNqkDP8vE6X8t4ZANQfPBn18FO80qIRWkxJLv9MJd9yowc$
To modify your subscriptions, click here:
uppwQRFYZEbK8RzkWpxMVQCNbKNqkDP8vE6X8t4ZANQfPBn18FO80qIRWkxJLv9MI8Yr74H$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BhNBf8Z5DimqcMZkwBE6gor2QOBT-
uppwQRFYZEbK8RzkWpxMVQCNbKNqkDP8vE6X8t4ZANQfPBn18FO80qIRWkxJLv9MCpi9GhU$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
September 30, 2026
Via Electronic Submittal (E-File)
Debbie-Anne Reese, Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, D.C. 20426
RE: Poe Hydroelectric Project, FERC No. 2107-CA
Poe Hiking Trail – 90% Design Progress Report
Dear Secretary Reese:
This letter provides Pacific Gas and Electric Company’s (PG&E) 90% Design milestone progress
report for construction of the Poe Hiking Trail, part of the Poe Hydroelectric Project, Federal Energy
Regulatory Commission (FERC) No. 2107. On March 2, 2023, FERC issued an order modifying
and approving PG&E’s plan and schedule for designing and constructing the Poe Hiking Trail.
Ordering Paragraph B requires PG&E to file progress reports at the stakeholder engagement
milestones identified in the schedule. PG&E previously filed progress reports on October 1, 2023,
and February 1, 2024, respectively. This letter satisfies the 90% Design milestone progress report
requirement by summarizing Poe Hiking Trail design and coordination efforts from PG&E’s
February 1, 2024, filing through September 29, 2026.
Project Progress
Following its February 1, 2024, filing, PG&E has continued design development with the Butte
County Resource Conservation District (BCRCD). PG&E incorporated stakeholder feedback into its
April 10, 2024, filing, presented the 30% design on July 22, 2024, and distributed updated and final
packages on July 31 and August 29, 2024, respectively. On August 29, 2024, PG&E requested an
extension of time (EOT) for the 60% design due to vegetation, survey, and access constraints. A
September 30, 2024, geologic hazard assessment further informed trail alignment, crossing,
safety, and construction considerations.
Following vegetation clearing and resource surveys in spring 2025, PG&E identified a sensitive
cultural site requiring additional surveys and alignment modifications. PG&E distributed the 60%
design on August 31, 2025, and discussed it with stakeholders on September 4, 2025. On
September 30, 2025, PG&E filed the 60% Design and requested an EOT for the 90% and 100%
Design milestones. Stakeholders submitted comments on September 30 and October 28, 2025.
PG&E responded to the September 30 stakeholder comments in the November 3, 2025, FERC
filing. American Whitewater filed comments to FERC on October 28, 2025; PG&E has addressed
these comments in Enclosure 2.
When Gallo Glass declined an easement, PG&E discussed an alternative alignment with
stakeholders on January 6, 2026. The revised alignment was completed on January 28, 2026, and
representatives of PG&E, United States Forest Service (USFS), and BCRCD walked the proposed
route on March 9, 2026.
Debbie-Anne Reese, Secretary
September 30, 2026
Page 2
PG&E issued the 90% design package on August 13, 2026. USFS and Mike Taylor subsequently
provided comments addressing trail design, construction, river access, and consistency with field
conditions. PG&E’s responses are included in this progress report, and applicable revisions will be
incorporated into the 100% design.
Current status
PG&E is following the schedule in EOT filed with FERC on September 30, 2025, and anticipates
meeting the remaining milestones. PG&E was engaged in the early phases on the permitting
process late in 2025, but the unexpected reroute around the Gallo Glass property stopped
progress until the reroute could be completed and the alignment verified in February 2026. The
change in trail alignment produced a major delay in the permit application process and timing.
The Poe Hiking Trail 90% Design is provided in Enclosure 1. PG&E’s response to Stakeholder
comments for the 60% and 90% Design are provided in Enclosure 2. Stakeholder comments are
included in Enclosure 3.
For general questions, please contact Anna Urias, license coordinator for PG&E, at 530-201-1961.
Sincerely,
Matthew Joseph
Supervisor, Hydro License Management
Enclosures:
1. Poe Hiking Trail 90% Design
2. PG&E Responses to Comments
3. Stakeholder Comments
cc: See Attached List
Debbie-Anne Reese, Secretary
September 30, 2026
Page 3
cc: via email w/enclosures
Aondrea Bartoo, USFWS – aondrea_bartoo@fws.gov
Jessica Dyke, SWRCB – Jessica.Dyke@Waterboards.ca.gov
Nathan Fisch, SWRCB – Nathan.Fisch@waterboards.ca.gov
Michael Maher, CDFW – Michael.Maher@wildlife.ca.gov
Beth Lawson, CDFW – Beth.Lawson@wildlife.ca.gov
Kamie Loeser, Butte County – kloeser@buttecounty.net
Loren Everest, Forest Service – loren.everest@usda.gov
Clay R. Davis, Forest Service – clay.davis@usda.gov
Dawn Alvarez, Forest Service – dawn.alvarez@usda.gov
Kurt Sable, Forest Service – kurt.sable@usda.gov
Cecily Merwin, Forest Service – cecily.merwin@usda.gov
Jacqueline Phipps, Forest Service – Jacqueline.Phipps@usda.gov
Chuck James, Forest Service – Charles.James@usda.gov
Jonathan Berry, Forest Service – jonathan.berry@usda.gov
Leslie Edlund, Forest Service – leslie.edlund@usda.gov
Colleen Heard, Forest Service – colleen.heard@usda.gov
Emily Doe, Forest Service – Emily.Doe@usda.gov
Erika Brenzovich, Forest Service – erika.brenzovich@usda.gov
Caitlin Ostomel, Forest Service – caitlin.ostomel@usda.gov
Scott Harding, American Whitewater – scott@americanwhitewater.org
Dave Steindorf, American Whitewater – dave@americanwhitewater.org
Theresa Lorejo-Simsiman, American Whitewater – theresa@americanwhitewater.org
Thad Walker, BCRCD – thad@bcrcd.org
Greg Mazu, Howler Group – greg@howler.group
Tracey Ferguson, Plumas County – traceyferguson@countyofplumas.com
Andy Pickett, Butte County – APickett@buttecounty.net
Paula Daneluk, Butte County – PDaneluk@buttecounty.net
Doug Teeter, Butte County – DTeeter@buttecounty.net
Chris Shutes – blancapaloma@msn.com
Mike Taylor – ljmftaylor68@gmail.com
Peggy Moak – pmoak19@gmail.com
Konkow Valley Band Tribal Chair – konkowvalleybandpoctribalchair@gmail.com
ENCLOSURE 1
DRAWN BY
GM
ISSUE
8/10/2026
CLIENT
Pacific Gas and Electric
PROJECT
POE REACH 90% TRAIL DESIGN
PROJECT NO.
POE REACH 90% TRAIL DESIGN
CLIENT CONSULTANT
Pacific Gas and Electric Butte County Resource Conservation District
150 Chuck Yeager Way - Suite A
Oroville, CA 95965
Phone: 530.693.3173
PROJECT LOCATION MAP
Latitude: 39.746402
Longitude: -121.471864Table of Contents
Section Page
Scope of Work 1
Project Overview 2
Trail Management Objectives 3
Trail Typical Drawings 5
Apendix 1: Maps 9
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
01
Project
Overview Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
02
TMOs Class 2
Trail
Trail Class 2 Description
Trail Class 2 is defined as a moderately developed trail type that provides a continuous and discernible, yet narrow and rough tread. Surfaces are typically composed of
native materials with minimal grading, and while the route is clear to the user, it retains a primitive feel. Single-lane passage is standard, with only minor allowances
for passing in select locations. This class balances accessibility with a rustic character, offering a backcountry experience while still maintaining a visible, passable
route. Vegetation may encroach into the trailway, and naturally occurring obstacles—such as rocks, roots, or logs—may be present, requiring users to navigate around
them.
Constructed Features and Trail Elements
Constructed features along a Class 2 trail are limited in size, scale, and frequency, and are often built from native materials. Drainage structures, if present, are minimal,
with resource protection and route definition prioritized over user comfort. Crossings are generally by natural fords, and bridges, if installed, are only provided where
necessary to protect resources or maintain essential connectivity. These trails are not designed for high levels of traffic or speed but rather for low-impact, self-reliant
travel consistent with the surrounding environment.
Recreation Setting and Intended Use
Signage is sparse, typically limited to route identification at junctions or markers where the location is not self-evident. Regulatory and resource protection signs are
infrequent, and destination or interpretive signs are uncommon. The surrounding recreation environment remains natural and essentially unmodified, often aligning
with Primitive to Roaded Natural settings within the Recreation Opportunity Spectrum (ROS). This class of trail is intended to provide a more challenging and
immersive outdoor experience, supporting uses where a modest level of development is sufficient to meet management objectives without compromising the trail’s
natural character.
Field-fitting Trail Class Specifications
Trail Class standards presented in this planset, including tread width, grade, corridor dimensions, and structure requirements, represent design targets developed from
Forest Service Standard Trail Plans and Specifications and available field survey data. Actual field conditions, including but not limited to exposed bedrock, unstable
slopes, dense vegetation, or other site constraints not fully captured during design, may render strict compliance with one or more standards impracticable at a given
location. Where this occurs, the Contractor may deviate from the applicable standard to the minimum extent necessary to construct a safe and durable trail segment,
provided the deviation is documented and approved by PG&E prior to or concurrent with construction. Such deviations shall not constitute a change in scope unless
they result in a material change to trail length, alignment, or structure count.
PRELIMINARY TRAIL MANAGEMENT OBJECTIVES
Trail Type Segment: Class 2 USFS Trail
Difficulty Rating: Difficult
Tread Width: 36”
Corridor Width: 24-48” wide
Tread Rugosity: Rugged, rocky and rooty, protrusions <6” above
trail tread
Average Gradient: <7%
Maximum Sustained Grade: 25%
Maximum Grade: 35%
Typical Tread Material: Native and limited grading. May be
continuously rough.
Sideslope Steepness: Flat to 25%
Turn Radius: Minimal, <3ft, with grade reversals above and
below
Trail/Structure Formality: Structures of limited size, scale, and
quantity; typically constructed of native materials. Structures
adequate to protect trail infrastructure and resources.
Wet Area Crossing Formality: Natural fords.
Duty of Care: Low
Intended Experience: This backcountry-style trail should provide
a slow user experience. The final trail alignment should constantly
reverse with minimal sinuosity. Excavated soil will be utilized to
elevate the trail where needed to avoid water.
Section Detail: Class 2 Trail
Not to Scale
1
1
LEAF LITTER TO COVER ALL
BACKSLOPE AND SPOILS
FOLLOWING TREAD COMPACTION
TREAD WIDTH VARIES.
MAXIMUM 36”
OUTSLOPED 3-7%
TRAIL TREAD SURFACE,
MECHANICAL COMPACTION
EXISTING GRADE
STONE/UNDERSTORY TRAIL ANCHORS,
NOT LESS THAN 24”
Plan Detail: Class 2 Trail
Not to Scale
1
2
LEAF LITTER TO COVER ALL
BACKSLOPE AND SPOILS
FOLLOWING TREAD COMPACTION
TRESS AS ANCHORS NOT
LESS THAN 24”
TREAD WIDTH VARIES.
MAXIMUM 36”
TRAIL TREAD SURFACE,
MECHANICAL COMPACTION
VIA POWERED OR HAND
TAMPING (TWO PASSES)
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
03
Trail Typicals
Grade ReversalGR
Low Point Water Drain
Backslop
eTrail Tread
9. In many locations, small amounts (generally one to five cubic yards) of fill material
will be necessary to super elevate turns, protect root systems of mature trees, and/or
create tread transitions to bridges, boardwalks, and/or constructed technical trail
features. It is assumed that the majority of this material will be created through the
tread cutting process. If this native material does not readily compact, suitable fill
should be located near the trail, transported with minimal impact to the surrounding
forest, and off-trail tracking shall be naturalized with forest materials following the fill
development process.
10. All excavated materials not used in the trail tread or other trail structures shall be
stabilized within seven (7) days of the construction. Spoils shall be distributed in a thin
layer adjacent to the trail tread. Care should be taken to avoid placing spoils in
drainages or swales. When possible, spoils should be mulched with native materials to
discourage erosion while native seed stocks reestablish.
11. A turn is defined as a change of direction across the landscape that requires the trail
to cross the fall line. Turns will be constructed as traditional rolling crown switchbacks or
as insloped, bermed turns as appropriate considering the trail type. All turns must
include an entrance and exit rolling grade dip to minimize down-trail flow during
precipitation events.
12. A designed grade reversal or constructed rolling grade dip should occur at least
every one hundred (100) feet and be strongly anchored to discourage short-cutting.
13. Any portion of trail above the finished trail tread shall be composed of mineral soil.
Fill structures shall have a fill slope no steeper than two-to-one (2:1) or the angle of
repose of the local soil, whichever is shallower. Fill structures shall be completely
stabilized and compacted. Raw faces that are not part of the trail tread shall be
stabilized as described above.
14. Mechanized equipment use shall be limited to the trail corridor and approved
access routes, as determined by the Owner’s Representative. Following construction,
all track marks will be raked smooth and affected areas will be finished to have a natural
shape (i.e. spoils piles rounded, smoothed and cleared of significant brush, blade edges
blended. A spill kit suitable for five gallons of fluid will be maintained onsite and within
five hundred feet (500’) of mechanized equipment whenever equipment is being
operated. Scarring of trees is to be avoided. Machine service and fueling shall not take
place within five hundred feet (500’) of a wetland or perennial drainage. Machine
access is restricted to the trail corridor, except for minimal and restored incursions to
access fill materials.
15.Trail Class standards presented in this planset, including tread width, grade, corridor
dimensions, and structure requirements, represent design targets developed from
Forest Service Standard Trail Plans and Specifications and available field survey data.
Actual field conditions, including but not limited to exposed bedrock, unstable slopes,
dense vegetation, or other site constraints not fully captured during design, may render
strict compliance with one or more standards impracticable at a given location. Where
this occurs, the Contractor may deviate from the applicable standard to the minimum
extent necessary to construct a safe and durable trail segment, provided the deviation is
documented and approved by PG&E prior to or concurrent with construction. Such
deviations shall not constitute a change in scope unless they result in a material change
to trail length, alignment, or structure count.
General Construction Notes
1.Trail details and specifications are located on Sheet 3 - Sheet 5. Sheets 2 and 3
present general trail corridor, tread, and constructed feature attributes. Immediately
prior to the construction process flagging will be placed to delineate a specified trail
location. Minor field adjustments are likely to occur during the construction process,
including alterations to better position trails in relation to large trees and/or other
vegetation, to avoid wet soils and/or other negative subsurface conditions, and/or to
optimize the desired design characteristics of the particular trail.
2.Construction will be limited to the daily output that can be considered finished
work and ready for inspection.
3.Construction access, materials stockpile, and/or borrow pit locations will be
coordinated with the designated site representative of Pacific Gas & Electric.
4.All work shall be accordance with OSHA codes and standards. Nothing indicated
in this document shall relieve those providing construction services from complying
with any and all appropriate safety regulations.
5.Trail corridors developed in the design process have been cleared for
environmental and/or historic/cultural significance. In the event that a previously
unidentified resource is found during the construction process, construction shall be
immediately suspended and the constructor shall contact Pacific Gas & Electric's
Project Manager who will coordinate an evaluation with subject matter experts and
then determine the appropriate action.
6.Trail corridor clearing shall be confined to vegetation within four feet (4’) of the
centerline of the trail. Mature trees that delineate the trail corridor shall be retained
where a minimum of thirty-six inches (36”) can be maintained at chest height (forty
eight inches for flow trails). Mature trees greater than six inches (6”) dbh and vines
greater than two inches (2”) dbh will be retained unless permission for removal is
secured with Owner’s Representative. Trees within the trail corridor shall be
stumped and removed or cut to an elevation below the finished trail tread. All
cleared vegetation shall be cut to a maximum length of twenty four-inch (24”)
lengths, scattered so as not to impede water flow, and butt ends of any cut
materials greater than one inch (1”) shall be angled away from the trail tread.
7.Trail tread shall be full bench cut construction whenever possible, with mineral
soil forming the entire width of the tread. Finished trail tread will be mechanically
compacted and retain a three-to-eight percent (3-7%) outslope. Tread roughness,
protrusions, and obstacles may be left as per each trails specifications.
8.Backslopes shall be graded back to an angle less than the angle of repose for
the soil with a three-to-one (3:1) slope being the general condition. Large roots and
stumps will be flush cut with the final slope and forest debris (i.e. leaves, needles,
duff) will be lightly spread over the slope to aid in stabilization and naturalization.
Rock Section Handhold Chain
Reference: USFS STD_937-10-01 Railing System | Standard rock anchor and
via ferrata installation practice
Where the trail crosses a steep, exposed rock section, a fixed chain shall
be installed to provide a handhold for balance. This is an aid only — not a
fall-arrest or clip-in system.
Use stainless steel glue-in or expansion anchor bolts, 1/2-inch minimum
diameter, sized and embedded per manufacturer specification for
the rock encountered. Avoid fractured or hollow-sounding rock.
Use galvanized or stainless chain, 3/8-inch minimum link diameter, rated
for outdoor use. Connect to anchors with rated quick links or master
links — no improvised hardware.
Space anchors 8 to 10 feet apart, closer at turns or difficult moves. Set the
chain at a natural hand-reach height above the tread.
Clear drilling dust from each hole before setting anchors. Allow glue-in
anchors to fully cure before loading.
Terminate chain ends with the same anchor standard used at
intermediate points. Cap or tape sharp ends.
Field-Cast Concrete Step Units
Reference: USFS STD_936-20-01 Overlapping Rock Steps |
USFS STD_933-20-02 Concrete Masonry Unit Barrier
Where native rock of suitable size is unavailable, steps shall
be constructed as field-cast concrete units formed to
approximate natural stone. Units are cast individually at a
staging area within approximately 200 feet of the installation
point and short-hauled into place after cure. Each unit is 36
inches wide by 24 inches deep by 7.5 inches high, formed
with standard 2x8 lumber.
Use Quikrete 5000 mixed with on-site water per
manufacturer instructions. Reinforce each unit with
one sheet of 6x6, 10-gauge welded wire remesh cut to
33" x 21" and placed flat, mid-depth in the form.
Cast on a flat, stable surface outside any environmental
buffer. Build a reusable 2x8 form and reuse it for each
unit.
Place concrete in two lifts to work material under and
through the remesh. Finish with a broom drag for a
non-slip tread and chamfer all top edges 3/4-inch.
Cure a minimum of 7 days before moving. Units weigh
approximately 280 to 300 lbs — plan transport
accordingly.
Set each unit on a prepared mineral-soil or bedrock bearing
surface, tilted 2% front to back to shed water. Maintain
10-inch minimum run, 10-inch maximum rise, and 6-
inch minimum overlap between units.
Backfill in 6-inch compacted lifts and grade to direct water
off the tread.
Embed Rock
>2/3 Buried
Large Rock
Anchor
>100-
pounds
Trail
Tread
Rock Retaining MonowallMWTypical Rock Step
Not to Scale
A
1
Trail Tread
Trail Tread
Step Width
Typical Rock Step
Not to Scale
A
1
Trail Tread
Trail Tread
6” Minimum
Step Overlap
10
”
M
a
x
i
m
u
m
Ri
s
e
Tread Width
Backslope
Hinge Point
Critical Edge
Blend Fill No More than 4” deep
Typical Full Bench
ConstructionNot to Scale
FB
1
Cut, Disperse, and Blend
Typical Rock Armoring
Not to Scale
RA
1
Trail Tread
50lb Minimum
Native Rock
Tread Width
Bury 2/3 of rock
Mash small rock
And dirt between
Rock courses
Rock Retaining Wall
Not to Scale
RW
1
Mineral Soil
and Rock less
than 3" to Backfill
Capstone Course
Foundation Course
Wall Stone
C
o
u
r
s
e
s
Capstone with sufficient mass and/or
shape to provide stable top course
Foundation course to be
tilted at 3:1 to support
wall batter
Rock and stones shall be
sourced on site
36"
24
"
7
1
/
2
"
36"
36"24"
7
1
/
2
"
~30% of
Step Depth No less than
60% of
Step Depth
Turn Apex Point
Turn Radius Point
Rock Wall When Specified
Grade Reversal
Below Upper
Upper Grade Reversal Turning Platform
Typical Turn Construction
Not to Scale
TT
1
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
04
Stream
Crossing
Typicals
Rock-Armored Stream Crossing
Reference: USFS STD_917-10-01 Natural Ford | USFS STD_917-20-01 and STD_917-20-02 Constructed Ford Rock Structure
Stream crossings shall be constructed as rock-armored fords using native rock sourced on or near each site. The structure stabilizes
the streambed and banks, provides a stable tread for trail users, and resists scour and headcut progression during high flows. Site-
specific dimensions and armor lengths are shown in the stream crossing profiles.
Site Prep
Remove duff and topsoil from the ford footprint and approaches down to mineral soil.
Clear oversized rock from the crossing area between side retainer locations. Stable embedded boulders may remain and be
incorporated into the design.
Excavate to foundation depth where specified. Install geotextile across the full foundation width where specified, lapping seams a
minimum of 12 inches downstream.
Rock Dam and Retainers
Embed the rock dam into each bank a minimum of 12 inches. Construct the dam top level across the full ford width, 8 inches maximum
above the typical streambed.
Hand-place the largest available rock as the dam face, keying smaller rock into the gaps to minimize voids. Build the dam body to 2x
bankfull height as shown on the drawings.
Set side retainers perpendicular to the tread, buried into the bank and keyed into the streambed, at approximately 12-inch spacing.
Surface Course
Hand-place and interlock rock across the full ford width and length shown on the drawings. A properly placed rock should not move
under a firm kick.
Keep the surface flush with or slightly above the streambed, with no rock projecting more than 3 inches above its neighbors.
Where specified, install stepping rocks on the upstream edge, embedded one-third of their depth.
Approach Transitions
Blend approach grade as the average of the upland trail grade and ford grade — avoid abrupt breaks at the bank.
Taper tread width gradually from trail width to full ford width.
Outslope or grade-reverse the approach so water sheds off the tread before reaching the crossing. Armor erodible banks with rock or
compacted backfill.
Rock Sizing by Flow Exposure
Low-flow crossings: standard on-site rock is adequate. Focus on tight interlocking and bank embedment.
Moderate-flow crossings: face rock should require two people to place. Watch grade relative to any downstream features such as
waterfalls.
Debris-fan crossings with shifting channels: prioritize deep bank embedment and field-fit the alignment if the channel has moved since
staking.
Highest-flow crossings: use the largest available rock on the project for the dam face.
Small swale crossings: light armoring is sufficient — do not over-build.
Begin/End Ford
Width to Daylight
Begin/End Ford
Width to Daylight
Begin/End Ford
Width to Daylight
Retainer Type
As Specified
Bury Side Retainer
Perpendicular to
Tread Surface
High Water MarkDownstream
Ford Width
Install Stepping Rocks
on Upstream Edge of
Tread
Remove Large
Rocks to Provide
Level Tread Surface
in Channel
Retainer Type as
Specified
12 inches Typical Spacing
PLAN VIEW
Begin/End Ford
Width to Daylight
Begin/End Ford
Width to Daylight
Tread
Backfill with
Stable MaterialRetainer Type
as Specified
C L
Stream
UPSTREAM VIEW
Install Stepping Rocks
Embed 1/3 of Rock Depth
Downsteam
STEPPING ROCK DETAIL
Ford WidthRock Dam Length
Hand-placed
Rock Dam
Face Rocks Install Stepping Rocks
Embed 1/3 of Rock Depth
Downstream
Typical Streambed
2X BACKFULL HEIGHT
Construct Top
of Dam Level
Embed Rock Dam
Into Each Bacnk and
Stream Bottom
12 inches minimum
Ford Width
Transition
Area
Approach
Surface Course Length
Approach
2x Backfull Height
Transition
Area
C L
Stream
Surface Course
when specified and
staked on the ground
Typical Foundation
when specified
Foundation Length
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
05
Signage and
Parking
100ft by 100ft existing parking
Proposed Trail Connection
On Road Parking
Proposed Trail Connection
Parking Area Sign Installation
Reference: USFS EM-7100-15 Sign and Poster Guidelines for the FS
Sign posts and panels at the parking area shall be installed in accordance with USFS EM-7100-15 Sign and Poster
Guidelines for the Forest Service. That document governs sign specifications, materials, and placement. The following
notes apply to all post and hardware installation.
Posts shall be treated wood or steel as shown on the construction drawings. Wood posts shall be pressure-treated with
CCA (Chromated Copper Arsenate) rated for UC4A ground contact. Post sizing and maximum sign area by post size
are shown in the sign details table on the drawings. Steel post sizing shall conform to EM-7100-15.
All hardware — including bolts, nuts, washers, and lag screws — shall be aluminum or hot-dip galvanized steel. Befor
e installing lag screws, drill lead holes in the post to prevent splitting. Bolt holes through the post shall be drilled no
more than 1/16 inch larger than the bolt diameter.
Excavate post holes to the embedment depth shown on the drawings. Set posts plumb and at the correct spacing for
the sign panel size. Backfill around each post with suitable material, compacted in 6-inch lifts until no visual
displacement occurs.
Overall Sign Chart
Type Number of Locations
Start of Trail Sign 2
Trailhead Parking Road Sign 4
North Parking Access
South Parking Access
12”
18
”
6’
-
8
’
3’
-
0
”
6”
18” DIA MIN
Instructional Sign
4x4 Wooden Pressure
Treated Post Or
1.5” ID HDG Steel Pipe
Slope Top of FTG
Concrete Backfill
Notes:
1. PG&E to supply the Instructional Signage and Warning
Sign with the project Specific verbiage.
2. Contractor to procure and install the post and sign.
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
06
Appendix 1 -
Site Maps
Appendix 1 - Site Maps
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
07
Overview
Map-North
North Stream Crossing Chart
Stream #1Stream #4
Stream #2&3
Stream #5
Stream #6
Stream #7
Stream #8
Stream #9
Stream #11
Stream #10
Stream #12a
Stream #12b
Stream Crossing Channel Width Channel Depth Prescription Estimated Length Notes
1 8 Rock Armoring 15 Rocky substrate
2&3 6 Rock Armoring 55 Rocky substrate
4 6 Rock Armoring 15 Dry. More of a Seep
5 Rock Armoring No defined channel
6 8 Rock Armoring/Steps 30
Super rocky terrain. Bridge may need
stairs
7 None Needed No defined channel
8 5 Rock Armoring 10
9 7 Rock Armoring 10 Stairs may be needed
10 3 Rock Armoring 10
11 Rock Armoring 5 No defined channel
12a 9 Rock Armoring 5
12b 9 None Needed
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
08
Overview
Map-South
South Stream Crossing Chart
Stream #12a
Stream #13
Stream #14
Stream #16
Stream #15
Stream #11
Stream #12b
Stream Crossing Channel Width Channel Depth Prescription Estimated Length Notes
11 Rock Armoring 5 No defined channel
12a 9 Rock Armoring 5
12b 9 None Needed
13 4 Rock Armoring 18 Swale that can transport water
14 2 1.0 Rock Armoring Swale that can transport water
15 8 Rock Armoring 20 Long wet area.
16 6 Rock Armoring 10
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
09
Overview
Inset Map
Directory
Trail Corridor Profile
Overall Trail Type Chart
Stream #16
Stream #14
Stream #15
Stream #13
Stream #12a
Stream #11
Stream #10
Stream #9
Stream #8
Stream #7
Stream #6
Stream #5
Stream #4
Stream #1
Overall Stream Crossing Chart
Stream #2&3
Stream #12b
Type Number of Segments Length
Historical Bench Modification 2 6,975
New Construction 3 11,023
Stream Crossing Channel Width Channel Depth Prescription Estimated Length Notes
1 8 Rock Armoring 15 Rocky substrate
2&3 6 Rock Armoring 55 Rocky substrate
4 6 Rock Armoring 15 Dry. More of a Seep
5 Rock Armoring No defined channel
6 8 Rock Armoring/Steps 30 Super rocky terrain. Bridge may need stairs
7 None Needed No defined channel
8 5 Rock Armoring 10
9 7 Rock Armoring 10 Stairs may be needed
10 3 Rock Armoring 10
11 Rock Armoring 5 No defined channel
12a 9 Rock Armoring 5
12b 9 None Needed
13 4 Rock Armoring 18 Swale that can transport water
14 2 1.0 Rock Armoring Swale that can transport water
15 8 Rock Armoring 20 Long wet area.
16 6 Rock Armoring 10
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
10
A-1 Inset Map
This section reseved for 100% Design Section Notes
1
1
3
5
7
2
4
6
8
Photo 1: Trail entrance from road.
Photo 3: Steep cross-slopes. Poor soil composition.
Photo 5: Switchback turn in steep, rocky terrain.Photo 7: Transitioning from steep terrain.
Photo 2: Mandatory steep drainage crossing.
Photo 4: Steep cross-slope continue.
Photo 8: Rock Crux
2 3
6
7
4 5
8
Stream #1
Photo 8: Approaching the rock crux for machine
work.
A-1 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
11
A-2 Inset Map
This section reseved for 100% Design Section Notes9
11
13
15
10
12
14
16
Photo 9: Example of rocky terrain on historical trail.
Photo 11: Existing trail bench.
Photo 13: Stream Crossing #4 existing conditions.
Photo 15: Stream Crossing #6
Photo 10: Section of historic trail through steep
cross-slopes.
Photo 12: Entrance to Stream Crossing #2&3.
Photo 14: Existing trail narrows, but exists.
Photo 16: Steep existing trail climbing up from
Stream Crossing #6.
9
10
11
12
13
14
15
16
Stream #7
Stream #6
Stream #5
Stream #4
Stream #2&3
A-2 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
12
A-3 Inset Map
This section reseved for 100% Design Section Notes17
19
21
23
18
20
22
24
Photo 17: Existing corridor.
Photo 19: Stream Crossing #9
Photo 21: Stream Crossing#10
Photo 23: Trail corridor through brushy terrain.
Photo 18: Existing Corridor.
Photo 20: Example of deadfall acroos corridor.
Photo 22: Cleared corridor in very steep and brushy
terrain.
Photo 24: Trail corridor through brushy terrain.
23
20
17
24
22
21
Stream #10
Stream #9
Stream #8
18
19
A-3 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
13
A-4 Inset Map
This section reseved for 100% Design Section Notes25
27
29
31
26
28
30
32
Photo 25: Trail corridor in mellow cross-slopes and
brushy terrain.
Photo 27: Approaching Stream Crossing #11 on
historic trail.
Photo 29: Transition into steep terrain.
Photo 31: Exising trail disapates from existence
slightly.
Photo 26: Trail corridor through steeper cross-slopes.
Photo 28: Looking back at approach to Stream
Crossing #11.
Photo 30: Random Trail Corridor Photo.
Photo 32: Existing trail section.
25
26
27
28
29
30
31
32
Stream #11
A-4 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
14
A-5 Inset Map
This section reseved for 100% Design Section Notes33
35
37
39
34
36
38
40
Photo 33: Example of rocky terrain.
Photo 35: Moderate cross-slopes.
Photo 37: Rocky terrain approaching Stream
Crossings #12a and #12b.
Photo 39: Steep and rocky terrain for a turn.
Photo 34: Existing trail.
Photo 36: Existing trail in varied terrain.
Photo 38: Stream Crossing #12a
Photo 40: Steep and rocky terrain for a turn.
33
34
35
36
37
38
39
40
Stream #12a
Stream #12b
33 34
A-5 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
15
A-6 Inset Map
This section reseved for 100% Design Section Notes41
43
45
47
42
44
46
48
Photo 41: Stream Crossing #13
Photo 43: Large bridge location.
Photo 45: Random Trail Corridor Photo.
Photo 47: Stream Crossing #14
Photo 42: Large rocky area with existing trail.
Photo 44: Flat, rocky area continues.
Photo 46: Extened mellow cross-slopes.
Photo 48: Existing trail and rock wall in drainage.
45
41
48
47
46
44
43
42
Stream #13
Stream #14
Stream #15
A-6 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
16
A-7 Inset Map
This section reseved for 100% Design Section Notes49
51
53
55
50
52
54
56
Photo 49: Stream Crossing #15
Photo 51: Example of brush density.
Photo 53: Steep trail grade, but workable.
Photo 55: Cleared Corridor.
Photo 50: Stream Crossing #15
Photo 54: Cleared Corridor.
Photo 54: Cleared Corridor.
Photo 56: Cleared Corridor.
50
49
51
52
53
54
55
56
Stream #15
Stream #14
A-7 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
17
A-8 Inset Map
This section reseved for 100% Design Section Notes57
59
61
63
58
60
62
64
Photo 57: Cleared Corridor
Photo 59: Very steep cross-slopes.
Photo 61: Rocky terrain with mellow cross-slopes.
Photo 63: Brushy mellow terrain.
Photo 58: Rocky Area
Photo 60: Stream Crossing #16
Photo 62: Steep side-slope with lots of rock.
57
58
59
60
62
64
61
63
Stream #16
Photo 64: Steep cross-slope and dense soil.
A-8 Inset Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
18
Slope Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
19
Soil Hydro
Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
20
Soils Map
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
21
Appendix 2 -
Site Notes
Appendix 2 - Site Notes
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
22
Stream Data
Appendix 2 — Hydrologic Analysis Summary
Source: PG&E Hydrography Staff, May 2026
A baseline hydrologic analysis was conducted for stream crossings along the proposed Poe Hiking Trail corridor to support
crossing design and construction planning. The analysis was prepared by PG&E Hydrography Staff in coordination with project
design efforts and is consistent with the trail alignment described in this document.
The analysis evaluated hydrologic conditions at crossing locations using accepted methodologies and available data. Results were
used to inform crossing type selection, structure sizing, and construction sequencing across the project corridor. Findings were
reviewed in the context of site-specific field observations collected during the project design process.
Stream crossing design elements reflected in this planset are consistent with the findings of the hydrologic analysis. Crossing
prescriptions, estimated structure lengths, and site-specific treatment recommendations have been developed to address
conditions identified through both field investigation and desktop hydrologic review.
The full hydrologic analysis report, including methodology, data sources, and site-by-site results, is available as a supporting
document to this planset. Contractors and reviewing agencies are encouraged to reference that document in conjunction with the
construction plans contained herein.
Stream Crossing Summary Table
USGS StreamStats Rational Method Flow Regime Drainage
Stream Crossing
ID Q100 (ft³/s)Q2 (ft³/s)Q100 (ft³/s)Q2 (ft³/s)(March 2026)Area (acres)
1 43.8 6.6 57.9 25.8 Intermittent 38.4
2 136.0 20.5 224.0 99.7 Intermittent 147.2
3 136.0 20.5 224.0 99.7 Intermittent 147.2
4 136.0 20.5 224.0 99.7 ---147.2
5 136.0 20.5 224.0 99.7 Intermittent 147.2
6 161.0 23.9 272.8 121.4 Intermittent 179.2
7 161.0 23.8 272.8 121.4 ---179.2
8 99.1 14.5 155.4 69.2 Intermittent 102.4
9 150.0 22.2 253.0 112.5 Intermittent 166.4
10 61.5 9.4 88.4 39.3 Intermittent 57.6
11 31.7 5.0 39.6 17.6 Ephemeral 25.6
12 247.0 38.1 N/A N/A Intermittent 294.4
12B 247.0 38.1 N/A N/A Ephemeral 294.4
13 237.0 36.3 10.0 5.0 Ephemeral 281.6
14 321.0 52.0 3.0 1.0 Ephemeral 2.0
15 321.0 52.0 N/A N/A Intermittent 390.4
16 75.9 11.3 117.3 52.2 Intermittent 76.8
Notes:
Q100 = 1% Annual Exceedance Probability (100-year) Flood; Q2 = 50% AEP (2-year/Bankfull) Flood
Flow Regime: Perennial = year-round flow; Intermittent = seasonal flow; Ephemeral = storm event flow only
N/A = indicates drainage area too large for Rational Method
IS
S
U
E
8/
1
0
/
2
0
2
6
DR
A
W
N
B
Y
GM
CL
I
E
N
T
Pa
c
i
f
i
c
G
a
s
a
n
d
E
l
e
c
t
r
i
c
PR
O
J
E
C
T
PO
E
R
E
A
C
H
9
0
%
T
R
A
I
L
D
E
S
I
G
N
PR
O
J
E
C
T
N
O
.
Bu
t
t
e
C
o
u
n
t
y
R
e
s
o
u
r
c
e
C
o
n
s
e
r
v
a
t
i
o
n
D
i
s
t
r
i
c
t
15
0
C
h
u
c
k
Y
e
a
g
e
r
W
a
y
-
S
u
i
t
e
A
Or
o
v
i
l
l
e
,
C
A
9
5
9
6
5
Te
l
:
(
5
3
0
)
6
9
3
-
3
1
7
3
23
Stream
Crossing
Diagrams
Stream #1
Stream #2&3
Stream #4
Stream #5
Stream #6
Stream #7
Stream #8
Stream #9
Stream #10
Stream #11
Stream #12a
Stream #12b
Stream #13
Stream #16
Stream #15
Stream #14
All diagrams are Not to Scale
8’
Stream Flow
Direction
Stream Flow
Direction
Trail
Site Conditions
-Steep 50%
-Subsurface Trickle
-Rocky Substrate
-Stable in Stream
-Highly Vegetated
-Small Head Cut Below
Crossing
Treatment
-Armor 15’
-Rock on Site
-Armor Headcut
5’
a
t
1
0
%
10
’
a
t
3
5
%
Stream Flow
Direction
Trail
Site Conditions
-Debris Slump-large sediment
slug
-Steam stream divides multi-
channel
-Cobble Substrate
-Flow present
-50’ wetted area
-Significant Headcut
Treatment
-Stepping Stones 35’ on North
side
-18’ of Rock Armoring
-Rock On Site
50’
10’
a
t
1
0
%
2’ at
1
5
%
29’ a
t
2
0
%
Pond
Install stepping stone
Headcut 5’
Headcut 15’
6’
Stream Flow
Direction
Trail
Site Conditions
-Has Flow
-Narrow and Steep
Channel
-Trees on both banks
-Has Diversion Potential
-Steep Banks
Treatment
-Armor 15’
10’
a
t
3
0
%
5’
a
t
2
0
%
1’
a
t
4
0
%
10’
a
t
2
0
%
Stream Flow
DirectionSite Conditions
-Dry
-No Channel Definition
Above
-Substrate Flow at
headcut
-Large boulders at
-Headwall above
Stream
-Seep not Stream
-Rough at Crossing
Treatment
-Rearrange crossing to
all easier crossing,
ample rock on site
11’
a
t
3
5
%
10’
a
t
1
5
%
No Channel Above
8’
Stream Flow
Direction
Trai
l
Site Conditions
-The trail is crossing at
the best spot
-Large Drainage
-Rock Substrate
-Stable in Channel
-Not highly vegetated
at crossing
-Large boulders at
crossing
Treatment
-Armor crossing
-Install steps on South
side for 30’ length
31’
a
t
5
0
%
10’
a
t
2
0
%
Tr
a
i
l
Steps for 30’
Stream Flow
Direction
Site Conditions
-No Channel definition
-Grass Vegetation
-Steep
Treatment
-No Treatment
6’
a
t
6
0
%
6’
a
t
3
5
%
8’30’
5’
Stream Flow
Direction
Trail
Site Conditions
-Stream Dimensions
4’x 1’
-Static Channel
-Crossing Vegetated-
Trees
Treatment
-Armor 10’
-Rock on Site
10
’
a
t
2
0
%
13
’
a
t
2
5
%
7’
Stream Flow
Direction
Trail
Site Conditions
-Crossing on Bedrock
-Stable Channel
-Vegetated
-10% Channel Grade
-Waterfall just below
crossing
-Trail approaches are
low grade
Treatment
-Armor 10’
-Rock on Site
11
’
a
t
1
5
%
5’
a
t
1
5
%
13’
Stream Flow
Direction
Site Conditions
-Small Stream
-Stable in Channel
-Rock Substrate
-Highly Vegetated
Treatment
-Armor 10’
-Rock on Site
6’
a
t
3
0
%
3’
a
t
4
5
%
Stream Flow
Direction
Site Conditions
-Swale not Stream
-No Channel Definition
at Crossing
-No Flow
-Vegetated
-Stable
Treatment
-Armor fill face at low
point
-Armor 5’
-Rock on Site
8’
a
t
5
%
6’
a
t
1
0
%
9’
Stream Flow
Direction
Site Conditions
-Super Cobble
-Substrate
-No Flow
-10% Channel Grade at
Crossing
-Had intense flows
during winter
Treatment
-Armor 10’
-Rock on Site
8’
a
t
2
5
%
3’
a
t
6
5
%
Site #12b 27’
Stream Flow
Direction
Site Conditions
-Historic or Overflow
Channel
-No Flow in Channel
-Rock Substrate
Treatment
-None needed, monitor
at construction. Armor
banks if needed.
9’
a
t
1
0
%
6’
a
t
1
0
%
Site 12a 27’
9’
4’
Stream Flow
Direction
Site Conditions
-Highly Vegetated-trees
-Minimal Channel
-Definition
-More swale than
stream
-No Flow
Treatment
-Armor 18’
-Some rock onsite
-Will likely need rock
imported
10
’
a
t
2
0
%
8’
a
t
3
%
13’ at 30%10’ at 20%
2’
Stream Flow
Direction
Tra
i
l
Site Conditions
-Stream is 30% grade
-Highly Vegetated
-Rocky substrate
-Stable crossing
-No Flow
-1’x1’ channel
dimensions
Treatment
-Armor 10’
- Rock on Site
8’
a
t
4
0
’
20
’
a
t
2
0
%
8’
Stream Flow
Direction
Tra
i
l
Site Conditions
-Rocky Substrate
-Stable Channel
-Crossing is at
confluence of 2 streams
-Step Pool System
-Good Natural crossing
spot
Treatment
-Armor 20’
-Rock on Site
Ve
r
t
i
c
a
l
2
’
30’ at37%30’ at 30%
Tra
i
l
Stream Flow
Direction
Tra
i
l
Site Conditions
-Rocky Substrate
-25% Channel Grade
-Highly Vegetated-
blackberry
-Historic (overflow)
path to the Right of
primary channel
-Static Channel with
rock
-Flow Present
Treatment
-Armor 10’
-Rock on Site
30’
a
t
1
3
%
6’
5’
a
t
2
5
%
8’
10’
a
t
1
0
%
3’
25’
a
t
1
5
%
ENCLOSURE 2
COMMENT RESPONSE MATRIX
Poe Hiking Trail 90% Trail Design -
Comment and Response Matrix
Clean formatted edition for stakeholder review
PROJECT Poe Hiking Trail
DESIGN STAGE 90 Percent Design
COMMENTING
ORGANIZATION Stakeholders
SOURCE DOCUMENT DATE August 10, 2026
PREPARED BY PG&E
MATRIX OVERVIEW
25 3 5
COMMENTS SOURCE TYPES COMMENTERS / ORGANIZATIONS
FORMAT NOTE
This matrix presents stakeholder comments on the Poe Hiking Trail 90% design and PG&E; responses in clearly labeled sections. It
also incorporates and addresses American Whitewater comments on the 60% design that were included in the October 28, 2025
FERC filing. Each comment is presented separately with its applicable source details, and long responses continue naturally onto the
following page.
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 2Prepared by PG&E
C-01 Rock-armored crossing standard
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 4 Rock-Armored Stream Crossing
STAKEHOLDER COMMENT
The standard rock-armored stream crossing detail appears excessive if applied literally. Most channels are stable,
and constructing a dam-like feature could cause unnecessary disturbance. Allow field modifications to fit individual
crossings.
PG&E; RESPONSE
Field modifications will be tailored to fit each individual crossing.
C-02 Hydrology table
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 22 Appendix 2 - Stream Crossing Summary
STAKEHOLDER COMMENT
The Stream Crossing Summary has limited utility because several watershed areas, stream identities, and
calculated discharges appear inconsistent. Recheck and correct the watershed assignments, stream numbering,
and discharge calculations, particularly for Streams 2-7, 12/12b, and 14-15.
PG&E; RESPONSE
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 3Prepared by PG&E
Stream Identities and Locations: The Waters of the U.S.(WUS) study ultimately confirmed the presence of stream
channels and the locations of stream crossings. Due to the timing of the WUS report, locations, site identities (Site
ID), were not fully updated in the 90% Design figures.
In the 90% Design Overview or Inset Maps, several locations or IDs were inaccurately identified:
• The location of Stream #2 and Stream #3 only contains one stream course. The lone stream crossing in this
location will be identified as Stream #2 on all maps.
• Stream #3 will be moved to the location of Stream #4 on all maps,
• Stream #4 was identified in the 60% design but was not verified in subsequent studies. It will be removed from
all maps.
• Stream #5 location was moved approximately 75 feet downstream to match location of WUS identification.
Location will be adjusted on all maps.
• Stream #7 was identified in the 60% design but was not verified in subsequent studies. It will be removed from
all maps.
• The locations of Stream #12a and Stream #12b are transposed and will be rectified in all maps.
• The text callout for Stream #14 is not accurate on the A-7 Inset Map and it will be removed.
Calculated Discharge
The baseline hydrologic analysis relied on the USGS Regional Regression Equations and the Rational Method, both
widely accepted approaches for estimating flood-frequency flows on ungaugged streams. The USGS StreamStats
model , which uses the USGS Regional Regression Equations, was used to delineate the drainage basin for each
stream crossing and estimate streamflow. Because StreamStats uses a 30-meter elevation model to calculate
drainage area, it may not fully capture topographic detail in the highly dissected terrain of the Feather River
Canyon. As a result, StreamStats grouped several crossings, including Streams #2 and #3 and Streams #12 and
#12b, within the same drainage basins. The March 2026 site visit confirmed that these crossings are fed by highly
disturbed and dissected upland terrain, where stream channels are often less defined and more prone to
migration. Accordingly, the StreamStats results are interpreted to represent the estimated total flow that could
occur within the basin or at any individual crossing in that basin. For example, if Stream #12 became blocked,
Stream #12b could receive all or part of the predicted flow.
The Rational Method was also used as a quality check for crossings with drainage basins smaller than 250 acres.
For Stream #14, the available topographic detail was sufficient to delineate a smaller drainage area, which was
then used in the Rational Method calculations.
C-03 Crossing documentation
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 23 Stream Crossing Diagrams
STAKEHOLDER COMMENT
The measured stream crossing diagrams are more useful than the calculated stream-flow values because they
reflect observed site conditions.
PG&E; RESPONSE
Streamflow is derived from a baseline hydrologic analysis of stream crossings that is intended to be a
screening-level design tool. The level of analysis is appropriate for identifying relative crossing sizes, comparing
alternatives, and supporting early discussions before advancing to final design. Streamflow estimates would be
refined using site-specific topography if warranted by site-specific design needs.
C-04 Crossing treatment conflict
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 4Prepared by PG&E
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Pages 7, 9, and 23 Stream Crossing 6
STAKEHOLDER COMMENT
Pages 7 and 9 state that a bridge may need stairs, while page 23 indicates a ford. Confirm the intended crossing
treatment and revise the design for consistency.
PG&E; RESPONSE
No bridges are used in the 90% design. The stream crossing design detailed on page 23 is the current design for
the crossing.
C-05 Stream classification
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 9 Stream Crossing 4
STAKEHOLDER COMMENT
Classify Stream Crossing 4 as perennial and narrow. Streams 2, 3, and 4 have relatively uniform year-round
discharge and limited potential for high winter flows that could cause diversion.
PG&E; RESPONSE
Streams are classified according to the flow regime identified in the WUS study. PG&E will update the flow regime
of each crossing in the next iteration of the 90% design. Stream 4, which is the location of the current Stream #3,
is identified as a perennial stream.
C-06 Stream identification
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 9 Stream 5
STAKEHOLDER COMMENT
Stream 5 does not appear to be a stream. No channel is evident above the abrupt step, and the feature may be a
coyote-hole prospect. Reevaluate its identification.
PG&E; RESPONSE
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 5Prepared by PG&E
Stream #5 location was moved approximately 75 feet downstream to match location of WUS identification.
Location will be adjusted on all maps.
C-07 Unmapped drainage
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 9 Unidentified stream downstream of Stream 5
STAKEHOLDER COMMENT
Recognize the wide, cobbly, intermittent stream approximately 60-75 feet downstream of Stream 5. The
commenter does not consider armoring or stabilization necessary and suggests reviewing updated LiDAR imagery
supplied by Scott Harding.
PG&E; RESPONSE
This is likely the current location of Stream #5. See comment C-06.
C-08 Crossing design
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Pages 7 and 9 Stream 9
STAKEHOLDER COMMENT
Stream 9 is a small perennial stream needing minimal approach erosion control. Verify whether the note stating
that stairs may be needed was intended for another stream.
PG&E; RESPONSE
No bridges are used in the 90% design. Stairs are not included in the preliminary design narrative on page 23.
C-09 Stream numbering and description
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 14 Streams 12a and 12b
STAKEHOLDER COMMENT
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 6Prepared by PG&E
The stream identities or descriptions appear reversed. The upstream 12a feature is an abandoned channel, while
downstream 12b is intermittent and active. Correct the map labels or associated descriptions.
PG&E; RESPONSE
The locations of Stream #12a and Stream #12b are transposed in the 90% Design and will be rectified in all maps.
See response to comment C-02.
C-10 Photo location
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 11 Photo 14
STAKEHOLDER COMMENT
Photo 14 appears to show the unidentified intermittent stream located downstream of Stream 5. Verify and revise
the photo location or caption.
PG&E; RESPONSE
Photo 14 captures the trail alignment and width of existing trail.
C-11 Photo identification
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Page 14 Photos 37 and 38
STAKEHOLDER COMMENT
Photo 37 appears to depict Stream 12a rather than 12b, and Photo 38 appears to depict Stream 12b rather than
12a. Verify and correct the photo labels.
PG&E; RESPONSE
Photo caption states, " Rocky terrain approaching Stream Crossings #12a and #12b". It does not identify or define
a specific stream crossing. The photo is intended to present the terrain and existing trail.
C-12 Photo captions
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 7Prepared by PG&E
Page 15 Photos 42, 43, and 48
STAKEHOLDER COMMENT
Verify the captions for Photo 42 (existing trail), Photo 43 (large bridge location), and Photo 48 (existing trail with
rock wall in drainage). The commenter indicates that the captions may be incorrect and that Photo 48 is located on
a spur ridge.
PG&E; RESPONSE
Photo 42. Photo shows vegetation clearance and footpath through corridor. Photo 43: No bridges are currently
proposed for this trail. We will remove bridge reference from the caption. Photo is showing characteristics of trail
corridor and topography. Photo 48. We will remove reference to rock wall.
C-13 Photo locations
SOURCE COMMENTER / ORGANIZATION
Written comment letter Mike Taylor
DRAWING / PAGE FEATURE / LOCATION
Pages 16 and 17 Photos 54-59
STAKEHOLDER COMMENT
Check the mapped locations of Photos 54, 55, and 56 on A-7 and Photos 57, 58, and 59 on A-8 because the
locations appear nearly identical.
PG&E; RESPONSE
These photos are intentionally identical to show the locations on the map.
C-14 Signage
SOURCE COMMENTER / ORGANIZATION
Meeting comment Chuck James (USFS)
DRAWING / PAGE FEATURE / LOCATION
STAKEHOLDER COMMENT
The 90% design lacks any description of signage.
PG&E; RESPONSE
Sheet 5 includes sign installation specifications and a table of sign location and quantity one sign will be placed at
start of the trail on each end of the trail, and two Trailhead Parking Signs will be placed near the parking area at
each end of the trail.
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 8Prepared by PG&E
C-15 River Access along trail alignment
SOURCE COMMENTER / ORGANIZATION
Meeting comment Dave Steindorf (AW) and Chuck James (USFS)
DRAWING / PAGE FEATURE / LOCATION
STAKEHOLDER COMMENT
The trail lacks any river access locations along the alignment. Both AW and USFS
PG&E; RESPONSE
As a reminder, this is a through trail alignment with hiking as the intended use. PG&E’s opposes developed river
access to protect sensitive resources. Expanding the intended use beyond hiking could introduce unanticipated
impacts related to historic properties, cultural resources, listed species, public safety, water quality, unauthorized
use, et cetera.
River access is already provided at multiple locations pursuant to the Poe Recreation Management Plan. In fact,
three river access facilities have been developed in the immediate vicinity of the proposed hiking trail. Bardees
Bar River Access is immediately north, and Poe Beach Trail and Poe Powerhouse River Access are immediately
south of the hiking trail alignment.
C-16 Trail Class
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
Page 2
STAKEHOLDER COMMENT
The trail is designed as a class 2 trail. The USFS is not opposed to a higher-class trail for construction, even if it is
maintained as a class 2 trail since the higher-class construction will likely be more sustainable long term (plan set
page 2)
PG&E; RESPONSE
The Class 1 and Class 2 trail classifications for the trail alignment reflects a balanced approach informed by
agency coordination and both environmental and cultural surveys. By considering these trail classes, PG&E aims to
reduce the extent of ground disturbance, limit the need for extensive structural features, and avoid unnecessary
disruption to sensitive habitats and cultural resources. This approach supports durable access while aligning
resource protection goals and regulatory obligations.
C-17 General Comment
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 9Prepared by PG&E
Page 4
STAKEHOLDER COMMENT
The plans need to show a typical rolling dip with reverse grade to remove water (plan setpage 4). Link to rolling
dip diagram STD 927-01 and 927-02 are available online
atwww.fs.usda.gov/managing-land/trails/trail-management-tools/trailplans .
PG&E; RESPONSE
PG&E will include this diagram in the 100% design drawing.
C-18 General Comment
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
Page 3
STAKEHOLDER COMMENT
The plans state that the trail will be full-bench construction. Plans do not identify where cut materials will be
placed if not a balanced cut-and-fill section. Identified locations should be included in the 90% design (General
construction notes item 7, plan set page 3).
PG&E; RESPONSE
If not a balanced cut-and-fill section, cut materials will be broadcasted downslope in a manner that minimizes
visual and environmental impact. Specific locations for broadcast material cannot be determined until construction
begins and will be selected based on field conditions encountered during trail construction.
C-19 General Comment
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
Page 4
STAKEHOLDER COMMENT
In addition to using native rock sourced on or near each site, rock-armored stream crossings should include option
for use of imported rock material as needed, if not available on site(plan set page 4). Any imported rock material
should match what is found in the general area of the proposed trail.
PG&E; RESPONSE
PG&E will include this option in the 100% design, however PG&E intends to use native rock sourced at each water
crossing site.
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 10Prepared by PG&E
C-20 General Comment
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
Page 3
STAKEHOLDER COMMENT
A Forest Service site representative, in coordination with a PG&E site representative, should be included in the
ground review and approval of the final project layout (flagging, staking) and periodic on the ground review during
the trail construction phase (plan set page 3). During trail construction, PG&E should provide the Forest Service
and other cooperators with weekly or bi-weekly construction progress reports (plan set page 3).
PG&E; RESPONSE
A Forest Service site representative, in coordination with a PG&E site representative, will be included in the ground
review and approval of the final project layout (flagging, staking) and periodic on the ground review during the
trail construction phase. PG&E will provide stakeholders with updates during the trail construction process.
C-21 General Comment
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
Page 3
STAKEHOLDER COMMENT
The plans use passive language when providing construction directives. Please remove passive wording and state
what is required. For example, change “spoils should be mulched” to “mulch spoils”. (General construction notes
item 10, plan set page 3).
PG&E; RESPONSE
PG&E will remove passive language in the 100% design.
C-22 General Comment
SOURCE COMMENTER / ORGANIZATION
Written comment letter Plumas National Forest (PNF)
DRAWING / PAGE FEATURE / LOCATION
STAKEHOLDER COMMENT
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 11Prepared by PG&E
After our comments that the 30 and 60% plans access the river at an identified village site, it appears that river
access is still not included in the 90% plan. This is not an acceptable option for the Forest Service. If access to the
river is not part of the trail as constructed, people will inevitably create their own access from the trail to the
water. This could result in multiple user-created social paths to the water and impacts to known or unknown
cultural resources. We suggest a clear path accessing the river be included somewhere before the known resource
and somewhere after, so that people are led away from the resource.
• River travelers have used the beach in question without serious impacts for years. If the trail is designed
appropriately, looting, vandalism, and other impacts to cultural resources can be avoided. Using vegetation design
to conceal the beach from the casual observer may be considered.
• During Forest Service discussions with Konkow Valley Band of Maidu Indians (KVBMI), river access trails are
supported by KVBMI.
• Any vegetation clearance needed during project planning and surveys should be the minimum needed to
complete planning and surveys with no tree removal, avoiding known sensitive resources, and all cut vegetation
being lopped and scattered.
PG&E; RESPONSE
PG&E’s primary reason to prevent unfettered river access in the area - protection of sensitive resources.
Expanding the intended use beyond hiking could introduce unanticipated impacts related to historic properties,
cultural resources, listed species, public safety, water quality, unauthorized use, et cetera.
River access is already provided at multiple locations pursuant to the Poe Recreation Management Plan. Three
river access facilities have been developed in the immediate vicinity of the proposed hiking trail. Bardees Bar River
Access is immediately north, and Poe Beach Trail and Poe Powerhouse River Access are immediately south of the
hiking trail alignment.
Any vegetation clearance required during project planning and surveys will be the minimum needed to complete
planning and surveys. Any necessary tree removals for trail safety will be reviewed, avoiding known sensitive
resources, and all cut vegetation will be lopped and scattered.
C-23 60% Design Drawing
SOURCE COMMENTER / ORGANIZATION
October 28, 2025, FERC filing American Whitewater
DRAWING / PAGE FEATURE / LOCATION
STAKEHOLDER COMMENT
PG&E’s 60% Progress Report Does Not Meet the Commission’s Requirements and Should Be Revised and
Re-Submitted
PG&E; RESPONSE
PG&E acknowledges that the 60% Progress Report did not include a narrative summary of progress relative to the
13 steps and 74 tasks outlined in the March 2, 2023, Plan and Schedule Approval Order. As noted in the Project
Background, updates to the Plan and Schedule were necessary to reflect the project conditions. To strengthen
future reporting, PG&E will provide Stakeholders with 45 days’ advance notice prior to submitting progress
reports-allowing 30 days for stakeholder review and 15 days for PG&E to incorporate relevant feedback.
Additionally, PG&E will hold a stakeholder meeting to discuss schedule-related comments, share updates on the
potential trail realignment, and property acquisition efforts.
Poe Hiking Trail | 90% Design Comment and Response Matrix
Page 12Prepared by PG&E
C-24 60% Design Drawing
SOURCE COMMENTER / ORGANIZATION
October 28, 2025, FERC filing American Whitewater
DRAWING / PAGE FEATURE / LOCATION
STAKEHOLDER COMMENT
PG&E’s Extension of Time Request Lacks Procedural and Substantive Basis
PG&E; RESPONSE
PG&E rejects the assertion that the EOT requests lack procedural or substantive merit. The delays encountered
throughout the design process have included: • Discovery of an additional cultural resource requiring further
delineation
• Seasonal constraints on botanical surveys, which must occur during spring bloom
• Ongoing efforts to secure trail access across private properties
These types of complexities are inherent in developing a trail in an environmentally and culturally sensitive area.
The EOT mechanism exists to address such contingencies, and PG&E has continually kept stakeholders informed
and involved throughout the process.
C-25 60% Design Drawing
SOURCE COMMENTER / ORGANIZATION
October 28, 2025, FERC filing American Whitewater
DRAWING / PAGE FEATURE / LOCATION
STAKEHOLDER COMMENT
Stakeholder 60 Percent Design Comments and Clarification Regarding Trail Class Determination
PG&E; RESPONSE
PG&E maintains that a Class I or Class II trail satisfies the “all-weather hiking trail” requirement that FERC outlined
in the October 20, 2022, order. In the order, FERC states:
“We also clarify that the 2019 Rehearing Order’s requirement for PG&E to construct an “all-weather trail,” if
feasible, was not meant to impose any specific Forest Service trail class standard. Rather, “all-weather trail” refers
to a trail suitable for year-round use. In this case, we see no reason why construction of a Forest Service Class 1 or
2 trail on Forest Service land would not fulfill the “all-weather trail” specification.”
PG&E’s proposal to designate the trail as Class I or II is consistent with FERC’s order and is intended to reduce
impacts on cultural and biological resources while satisfying the all-weather trail requirement.
ENCLOSURE 3
Comments regarding
Poe Reach 90 Percent Trail Design
Butte County Resource Conservation District
August 10, 2026
Prepared by: Mike Taylor September 13, 2026
The Poe Reach 90 percent design represents a significant milestone with the trail route and
stream crossings firmly established. Review of the submittal does raise several questions and
comments regarding stream identification, image captions and the utility of the Stream Crossing
Summary Table on page 22.
The “Rock-Armored Stream Crossing” on page 4 seems overkill if followed to the letter. Most of
the stream channels involved are currently stable with little reason to disturb them for the sake of
a standard template. Building a dam at crossings will only involve unnecessary channel
disturbance for a debatable benefit. I presume that there will be “field modifications” to suit
individual crossings.
The Appendix 2 Stream Crossing Summary Table Page 22 has little utility. Streams 2, 3, 4, and 5
share a watershed of 147 acres but each is assigned the same discharge for a given return period
with no attempt to apportion discharge among the streams. Streams 6 and 7 are assigned the
same watershed area but they are entirely separate streams with a significant difference in size.
Streams 12 and 12b are assigned the same watershed area although stream 12 is an abandoned
channel. Streams 12 and 12b are reversed with stream 12 an abandoned channel. Perhaps the
most interesting discharges appearing on the table are streams 14 and 15 with one watershed area
of 2 acres and the other 390 acres but each is assigned identical discharges. These errors make
the usefulness of the entire table rather doubtful.
Stream Crossing Diagrams appearing on page 23 have far more utility than the calculated stream
flow for various crossings since the diagrams are based on actual measurement and notation of
conditions.
The note for Stream Crossing 6 listed on North Stream Crossing Chart page 7 states “Bridge
may need stairs.” The same statement regarding stream 6 appears on the Overall Stream
Crossing Chart page 9. Stream Crossing Diagrams page 23 indicate that a ford will be utilized to
cross stream 6. I presume that the page 23 notation is correct.
Site specific comments follow.
Stream Crossings
Overall Stream Crossing Chart Page 9
Stream Crossing 4: Perennial. Narrow. Agreed diversion potential. Streams 2, 3 and 4 have
rather uniform year-round discharge with limited potential for high winter flow that
might result in diversion.
Stream 5: Not a stream. There is no evidence of a channel above the top of the abrupt step.
Likely a “coyote hole” prospect.
Unidentified stream: Continuing 60 to 75 feet or so from “Stream 5” is a fairly
wide, cobbly, intermittent stream. It had a bit of flow last winter. Ignore in terms of
needed armoring or stabilization but needs to be recognized. The series of streams from
streams 2 and 3 to this intermittent are better understood by checking the updated Lidar
imagery provided by Scott Harding. The streams have been incised into an ancient debris
torrent with some rather massive boulders at the lower end.
Stream 9: One boot wet perennial stream. Needs minimal approach erosion control.
. North Stream Crossing Chart page 7 indicates “stairs may be needed.” An errant
comment perhaps intended for another stream?
Stream 12a and 12b: A-5 Inset Map page 14 identifies stream 12a as upstream of 12b. Stream
12a, the upstream one of the two, is an abandoned channel. It is essentially a hydrologic artifact.
The downstream stream channel (12b) is intermittent and active. It appears that the stream
descriptions have been reversed based on the A-5 Insert Map. Alternatively, the identity of
streams 12a and 12b are reversed on the A-5 Insert Map.
Inset Map photos
A-2 Inset Map Page 11
Photo 14: Appears to be taken from the unidentified intermittent stream located a bit west
(downstream) of “Stream 5.”
A-5 Inset Map Page 14
Photo 37: Stream 12a not 12b
Photo 38: Stream 12b.not 12a
A-6 Inset Map Page 15
Photo 42: Caption “existing trail.” Is this correct?
Photo 43: Caption “Large bridge location.” Seems incorrect.
Photo 48: Caption “Existing trail with rock wall in drainage.” seems incorrect since the photo
location is on a spur ridge
Check locations of Photos 54, 55, and 56 on A-7 Insert Map page 16 and Photos 57, 58 and 59
on A-8 Insert Map page 17. The locations are nearly identical.